My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
URS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:39:17 AM
Creation date
8/30/2011 11:38:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Services including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />URS <br /> <br />William Travis (contC/.) <br /> <br />~ <br />'.... <br /> <br />o Trained approx. 60 internal auditors throughout the <br />corporation. <br /> <br />June 1996 - November 1999 B/E Aerospace, Delray Beach, f'L <br />Manufacturer of galley products for commercial aircraft <br />Quality Engincer/Manager <br />· Successfully lead efforts to obtain very stringent Boeing 01-9000 <br />AQS certification. <br />o Wrote Quality Policy Manual, all procedures and work <br />. . <br />l11S trucUons <br />· Effectively implemen ted Self-Inspection/Self Sufficiency <br />· Developed and implemented Supplier Certification program <br />dcveloping a total of 5 certified suppliers <br />· Through the development of inspection software, streamlined <br />receiving inspection process from 40 days to less than 3 hours. <br />· Through the development of inspection software, eliminated <br />95% of paper quality records. <br />· Successfully implemented Continuous Quality Improvement <br />program. <br /> <br />c <br /> <br />January 1994 - June 1996 Sensormatic Electronics Corporation, Boca <br />Raton, FL <br />Loss Prevention <br />Quality Engineer <br />· Developed Quality procedurcs for pilot project security tag <br />· Developed and implcmented software program to accommodate <br />100o;() testing data which gathered, analyzed and reported quality <br />yield and Statistical Process Control data. <br />· Developed and implemented procedures for audits, and <br />conducted training classes for all operators. <br />· Performed internal ISO 9000 audits. <br /> <br />Production Supervisor <br />· Supervised over 100 employees and several manufacturing and <br />assembly lines. <br />· Through the implementation of Quality practices and principles, <br />production increased 30% while quality improved nearly 50%. <br /> <br />c <br /> <br />Manufacturing Engineer <br />Principle Engineer of silicone wafer processing into diodes for security <br />tags/pick and place operation. <br />· Over a period of three months, silicon wafer scrap was reduced <br />from 40% to 10% by redesigning raw silicone scribing and <br />breaking techniques, as well as revisiting quality control test <br />cntena. <br />· \X1rote ISO 9000 manufacturing and maintenance work <br />instructions. Trained personnel on production methods. <br />· Designed, developed and modified machinery to implement and <br />enhance manufacturing processes leading to process validation <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.