Laserfiche WebLink
<br />,.- <br />~ <br /> <br />Areas of Expertise <br /> <br />1\ Icchanical [:ngint'cring <br />Electrical Engineering <br />Project &. Engr. l\ lanagemct1[ <br /> <br />Years of Experience <br /> <br />\'\"ith L'RS: .'\ \'ear, <br />\'\"ith Other Firm,: "W Year, <br /> <br />Education <br /> <br />c <br /> <br />\1L\.\ / L'niycr,it\" of \,\i,con,in- <br />O,hkmh II <)8S <br />ns /i\kchanical I:ngineenng <br />/;\ lilwaukec School of Engineering <br />/1<J77 <br /> <br />Registration / Certification <br /> <br />PI:;Flc lrida/#(J-1--1-W <br />PF/\,\'i,ccllbin/#21 (1-13. <br />PI:; \lichigan/#-1S<J 19. <br />PL/i\laine/#<)Sll. <br />PF/Penn,;\'h-ania/#(iSS(r71:. and <br />Projecti\ I anagcmclll <br />Pre ,fc"ional/ Pi\ IP#27 -1-277 <br />L"RS Proiecti\lanagcr Ccrtirlcati, >l1 <br /> <br />r <br />~ <br /> <br />URS <br /> <br />Dale S. Wiley, PE PMP MBA <br />Project Manager /Mechanical & Electrical Design Leader <br /> <br />Overview <br /> <br />Mr. \X1iley has over 30 years of experience in the planning, design, <br />construction management and inspection, technical and <br />economic/ financial evaluation, and modification/ rehabilitation, <br />construction oversight and project managemcnt of pO\ver water resource, <br />and civil/mechanical projects. <br /> <br />His responsibilities have included the planning, design, analysis, <br />construction management and inspection, and evaluation of projcct <br />featurcs such as: buildings, nuclear systems, boilers, turbines, <br />powcrhouses, dams, intake structures, canals, penstocks, gates, stoplogs, <br />trash racks, material handling, environmental cleanup and wastewater <br />treatments. I-Ic has been responsible for the preparanon of: mechanical <br />and hydraulic design computations for ncw and existing nuclear, fossil <br />fuel and hydroelectric power plant projccts, including design of <br />mechanical e(]uipment, piping, ventilation, equipment layout and a dam <br />water control gate modifications; contract plans and specifications for <br />construction and equipment procurement; and construction management <br />oversight. <br /> <br />Mr. \V'iley has been the lcad design enginecr for a large NPDES <br />wastewater treatment pump station and treatment system. He has been <br />responsible for the project engineering and construction management for <br />a 6050' long 9' diameter steel penstock piping project. He has been <br />responsible for the project engineering and construction management for <br />a large hydro dam & dike embankment stabilization project. <br /> <br />111 addition tvlr. \V'iley worked on numerous small and large projects at 3 <br />Nuclear Power Plants, 10 plus Fossil Fuel Power Plants, 20 plus <br />Hydroelectric Power Plants and 10 plus Everglades and Environment <br />Restoration Sites. He served on a plant operating staff for a period of 5 <br />years as the Senior Plant Engineer at the \X1isconsin Public Service <br />Corporation 372 M\V' J.P. Pulliam Coal-Fired Power Plant. He has been a <br />feahu"ed speaker at 3 distributed generation con ferences. <br /> <br />Prior to joining URS Corporation and \X1isconsin Public Service, he <br />worked for Gilbert/Commonwealth ,\ssociates (AK:A: \X1orleyParsons) in <br />the electric utility power plant design and construction management field. <br />He has had increasing responsibility and was assigned as Project <br />Manager/Project Engineer on multiple electric power plant and gas utility <br />projects. I-lis experience includes: building projects, nuclear power plant <br />projects; fossil fueled power plant projects; hydroelectric and water supply <br />dams and projects; shoreline protection projects; fossil fueled power plant <br />projects; flyash landfill projects; former manufactured gas plant <br />remediation projects; distributed power projects and unique and unusual <br />building and other projects. <br />