My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
URS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:39:17 AM
Creation date
8/30/2011 11:38:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Services including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />URS <br /> <br />~ <br /> <br />~ <br /> <br />Dale Wiley (contC/.) <br /> <br />Project Experience <br />Mechanical & Electrical Design Leader (2006 - Present) <br /> <br />Facilities Design Leader for the electrical and mechanical facility design <br />engineering department for the governmental, industrial, and electrical <br />power engineering projects. Facilities Design Leader for the electrical and <br />mechanical design engineering for the South Florida Water Management <br />District Stormwater and Everglades restoration projects. Involved in the <br />engineering management of a 6,397 acre water treatment, 18 miles of 13.2 <br />kV three phase underground electrical power distribution, and 2,100 cfs <br />pump station project including all detail design reports, design drawings, <br />technical specifications and major pump system equipment procurement. <br />Mechanical and electrical design leader for the electrical and mechanical <br />design engineering for the South Florida \X1ater Management District <br />Stormwatcr STA 6-2 Power Distribution Project. Completed a feasibility <br />study of power options, and then proceeded to design and construction of <br />an isolated interim underground 13.2 kV electrical distribution power <br />system with LP gas electric generators (power Pilot Project) for the STA <br />6 Section 2 and STA 6 Scction 1 enhancements projects. Mr Wiley is <br />currently thc lead shift supervisor in the operation and maintenance of the <br />electrical generators and 13.2 kV system. <br /> <br />c <br /> <br />Professional Societies! Affiliates <br /> <br />American Society of I'vlechanical Engineers (ASME)/Member 24 <br />years/#1321686 <br />PMI Certified as Project Managcment ProfessionaI/PMP#274277, <br />Scptcmber 7, 2005 <br />Other: Oconto, WI Harbor Commission, Chairman; Green Bay, \X11 Plan <br />Commission, Commissioner; and Frccmason, Master Mason <br /> <br />Specialized Training <br /> <br /> . <br /> . <br /> . <br /> . <br /> . <br /> . <br /> . <br /> . <br />C . <br /> . <br /> <br />Commonwealth Associates, Ine. "Basic Powcr Plant Systems" <br />General Physics Corporation "Nuclear Shift Technical I\dvisor- <br />Sys tems" <br />\X1isconsin Public Service Corporation "Radiation Safety" <br />Chesterton Company "Mechanical Seals" <br />Technical Seminars, Ine. "Piping Design & Fabrication per <br />ASME Section III and 1331 Codes" <br />AAA Technologies, Ine. "Triflex Piping Analysis Computer <br />Program" <br />Lightning Mixing Equipment Co. "Activated Sludge Process" <br />University of Wisconsin-Extension "Arc Welding Processes and <br />Their Applications" <br />Wisconsin Public Service Corporation and URS "QA/QC <br />Indoctrination & Training" <br />I'vWwaukee School of Engineering "Construction Claims <br />Seminar" <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.