Laserfiche WebLink
<br />URS <br /> <br />Dale Wiley (contC/.) <br /> <br />/'" <br />'--" <br /> <br />. Teledyne Engineering "ASME Boiler & Pressure Vessel Codes" <br />. ASME/IEE/ ASCE "Joint Power Conferences" <br />. Northwest Tcchnical Institute "\X1elding Seminar" <br />. EPRI!EP A "Flue Gas Desulfurization Symposium" <br /> <br />. 40-Hour Hazwopcr/1997, WI Landfill Operator/1987, <br />Competent Person/1997, \XIPSR Leadership Development/2003 <br /> <br />. PMI and URS Project Manager Training <br /> <br />Security Clearance <br />Kewaunee Nuclear Power Plant <br /> <br />Chronology <br /> <br />c <br /> <br />Gilbert/Commonwealth Associates (AKA: WorIeyParsons), <br />Reading, Pennsylvania and Jackson, Michigan <br /> <br />Engineering Technician (1973) <br /> <br />Associate Mechanical Engineer (1977 -1979) <br /> <br />Engineering Technician for the Mechanical and Nuclear Engineering <br />Department performing various technical tasks for the Three Mile Island <br />Unit 1 (PA) and VC Summers (SC) Nuclear Power Plants. Power plant <br />design engincer for thc design of modifications to Ohio utility coal fired <br />power plants. <br /> <br />Performed engineering tasks such as: hydraulic calculations for channel, <br />pump, and pipe sizing; I-IV AC calculations for heat loss and ductwork <br />sizing; and equipment material and performance selection. Responsible <br />for the dcsign of the $21M NPDES wastewater treatment system/plant of <br />the Eastlake and Lakeshore Power Plants in Ohio. <br /> <br />Wisconsin Public Service, Green Bay, Wisconsin <br /> <br />Mechanical Engineer (1979 - 1984) (1989 - 1999) <br /> <br />Plant Engineer (1984 - 1989) <br /> <br />Project Manager and Project Manager 2(1999 - 2005) <br /> <br />Power plant design engineer and project manager for the design and <br />construction management of new and numerous modifications of the <br />electric utility power plants. <br /> <br />c <br /> <br />Performed engineering tasks such as: nuclear reactor and steam generator <br />subsystem design selection and specifications; hydraulic calculations for <br />pump and pipe sizing; HV AC calculations for ductwork and fan sizing; <br />electrical wire and disconnect sizing and selection; design of dock walls <br />and structural sizing; grade and earthwork design; road and building <br />design selection and specifications; utility coal ftred boiler tube selecting <br /> <br />3 <br />