My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
URS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:39:17 AM
Creation date
8/30/2011 11:38:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Services including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />URS <br /> <br />Dale Wiley (contC/.) <br /> <br />c <br /> <br />and welding criteria; and supervlslOn of engmeenng design work and <br /> <br />construction by others. <br /> <br />Responsible for the design, review, project and construction management <br />of electric and gas utility projects as: Kewaunee Nuclear Power Plant <br />Reactor Head Vent System and other TMI modifications, new $15M 377' <br />Pulliam Power Plant Chimney, $5M C\X1A/\X1eston/Pulliam ash storage <br />landfills, Pulliam Unit 5 slope boiler tube replacement, $1.2M Oneida <br />Diesel Generator, Pulliam Power Plant Propane/Air Plant, Kewaunee <br />Nuclear Power Plant Simulator Building, $41M l'vIGP Gas Plant Site <br />Remediations, Prickett Hydro Selective Withdrawal Structure Siphon, <br />$6M Victoria Hydro 6050' Penstock Replacement, and $2.5M High Falls <br />Hydro Dam & Dike Embankment Stabilization. <br /> <br />c <br /> <br />URS Corporation, Boca Raton, Florida <br />Mechanical & Electrical Design Leader (2006-Present) <br /> <br />Mechanical and electrical desit,>11 leader for the electrical and mechanical <br />design enginecring for Power, South Florida \X1ater Management District <br />Stormwater and Evergladcs Restoration, and Palm Beach County Solid <br />waste Authority projccts. Involved in the cngineering management of <br />projcct design, design reports, technical specifications, construction <br />managemcnt and operations. <br /> <br />Mechanical and electrical design leader for the electrical and mcchanical <br />design engineering for the South Florida Water Managcment District <br />(SF\VI\1D) Stormwater and Evcrgladcs restoration projects. Completed a <br />feasibility study of power options, and then proceedcd to design, <br />conslrucuon managemcnt and multi-year operation of an isolated interim <br />underground distribution power system with LP gas electric generators <br />(Powcr Pilot Project) for the STJ\ 6 Section 2 and STA 6 Section 1 <br />enhancements projccts. Completed a feasibility study of the Everglades <br />Restoration Stormwater Treatmcnt Area (STA) Compartment C Area <br />Basis of Design Report options, and then proceeded as cngineering <br />manager for the design of the STA \X1ater Control Gates, 100 cfs <br />Hydration Pump Station, and 2100 cfs Major InOow Pump Station. <br /> <br />Mechanical and electrical design leader for the mechanical and electrical <br />design engineering for Roker Point and Emerald Bay Utility Projects, <br />Great Exuma, Bahama. <br /> <br />Mechanical and well design leader for the mechanical and well design <br />engineering for the Palm Beach County Solid Waste Authority two 3050 <br />foot deep Injection Well Replacement and 2000 gpm Pump Station <br />Upgrade. <br /> <br />r <br />'--" <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.