My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
URS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:39:17 AM
Creation date
8/30/2011 11:38:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Services including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />URS <br /> <br />David WIlson, CCM (cont'd.) <br /> <br />c <br /> <br />Project Management For U.5. Department OF Justice: <br /> <br />Senior Project Manager <br />Florence Service Processing Center, Florence, AZ <br />U.S. DO] INS (now ICE under DHS) <br />Services included: Pre Design Planning with DO), INS, Boarder Patrol, <br />GSA and COE Program Managers and local municipal representatives <br />and utility providers. Master Planning, Dcsign and Construction Phasing <br />for thc 10 year $19M Construction program. <br />PM Responsibilities included direct interface with DO), GSA and INS <br />(ICE) project represcntatjves. Management of the project team <br />developing the multi phase master plan and the phase 1 project design <br />and construction administrarjon serviccs for new 55, 000 SF detainec <br />processing, justice ccnter with courts and detention facility which included <br />a medical operations area for emergcncy triage, examination rooms, X- <br />Ray, isolation ward, pharmacy and mcdical staff offices. PM in charge of <br />proposal development and all Planning & A/E services and submittal to <br />U.S. Gcneral Services Administration. <br /> <br />c <br /> <br />Senior Project Manager <br />EI Centro Service Processing Center, EI Centro, CA <br />U.S. DO] INS (now ICE under DHS) <br />Services included: Pre Design Planning with DO), INS, Boarder Patrol <br />and COE program managers for the detention center program <br />Services includcd new site master plan, design and construction <br />administration scnriccs for ncw 25,000 SF detainee proccssing center and <br />detention facility which includcd a ncw kitchen / dining hall and a new <br />mcdical operations area for cmergency triage, examination rooms, X-Ray, <br />isolatjon ward, pharmacy and mcdical staff offices. PM in chargc of <br />proposal dcvelopment and all Planning & A/E scrvices and submittal to <br />U.S. Gcneral Services Administration. <br /> <br />~ <br /> <br />~ <br /> <br />Senior Project Manager <br />U.S. Board Crossing Station Improvements, CA <br />U.S. DO] INS & Border Patrol (now ICE under DHS) <br />Border Crossing Station Sites included: San Ysidro, Ca. / Tijuana, Mex. <br />and the Calexico, Ca. / Mexicali, Mex. crossing sites. <br />Improvements to the San Ysidro / Tijuana site (world's busiest border <br />crossing) services included Border Site Traffic Studics (including car / <br />truck & mass transit inspection lanes), pcdestrian crossing studies for <br />security and control. New road lane alignments, signage and paving. Ne\v <br />station booths and hardening, security systems and lighting and covered <br />crossing roof structure. Services included Master Planning, roadway / sitc <br />civil engineering and architectural design. Pre Design Planning with INS <br />and U.S. Border Patrol. PM in charge of proposal developmcnt and all <br />Planning & A/E services and submittal to U.S. General Services <br />Administration. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.