My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
URS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:39:17 AM
Creation date
8/30/2011 11:38:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Services including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />URS <br /> <br />David Wi/son CCM (contd) <br /> <br />c <br /> <br />Senior Project Manager <br />U.S. Board Crossing Station Improvements, AZ <br />U.S. DO] INS & Border Patrol (now ICE under DHS) <br />Border Crossing Station Sites included: Nogales, Az. / Nogales, Mex. thc <br />Naco, AZ. / Naco, Mex. and Douglas, Az. / Agua Prieta, Mex. crossing <br />sites. Improvements to the Nogales crossing site included Border Site <br />Traffic Studies (including car / tmck inspection lanes), pedestrian crossing <br />studies for security and control. New road lanc alignments, sign age and <br />paving. All crossing stations were updated with new station booths and <br />hardening, security systcms and lighting. Scrvices included Master <br />Planning, roadway / site civil cngineering and architectural design. Pre <br />Design Planning with INS and U.S. Border Patrol. PM in charge of <br />proposal development and all Planning & 1\/E services and submittal to <br />U.S. General Services [\dministration. <br /> <br />Project & Construction Management for International Clients: <br /> <br />c <br /> <br />Senior Project Manager, Le Groupe Fox LED R&D Labs <br />Montreal, Quebec Canada $125M <br />Owner's represcntative PM/CM responsiblc for the design & <br />construction of thc project. Included the managcment of procurement of <br />Montreal based dcsign/ engineering firms and construction firms, site <br />selection, contract negotiations and reporting to the Qucbec governmcnt <br />funding agency and venturc capital/partners group. <br />New technology transfer for LED development. Project included a <br />phascd construction of 40,000 SF Mfg. space with class 1000 clean rooms, <br />test labs and administrative offices. <br /> <br />Project Design-Build Manager <br />ST Microelectronics, R&D Facility, Singapore <br />On-site Program Design / Build Manager for, $60 million High Tech <br />R&D Facility. Client was a French microelectronics f1nn and the design <br />team consisted of Italian, French, Singapore and U.S. firms. Build team <br />involved Singapore, Korcan and Chinese contractors. Responsible directly <br />to Singapore based plant manager for the on time delivery of the facility. <br />Provided BD support for further Singapore group based services under a <br />2 year work visa. Responsible to develop and network with local region <br />consultants, contractors and vendors. <br /> <br />c <br /> <br />Project Design & CM Manager <br />Amkor Technology AMK-6 Fabrication Facility, Laguna, <br />Philippines <br />On-site Construction/Project Manager for the $110M renovation / re- <br />tool and expansion of the Test & Assembly Facility project. Responsible <br />for initial planning & design with U.S. based team and then final design by <br />Philippine associate ftrm. Korean Owner with U.S. and Philippine <br />management teams. Provided construction management for owner <br />contract negotiations and selection of Gapanese contractor). Provided <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.