My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
URS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:39:17 AM
Creation date
8/30/2011 11:38:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Services including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />URS <br /> <br />David Wi/son, CCM (contC/.) <br /> <br />c <br /> <br />specialized structural (seismic) studies & design, processing piping, tool <br />installation planning & phasing and construction cost oversight. <br /> <br />Senior Design-Build Manager <br />Hyundai, HAS Fabrication Program, Seoul, Korea $3 billion <br />Senior Design / Build Manager and North I\merican Coordinator for the <br />Hyundai HAS Fabrication Program. Program included Planning and <br />construction of 4 new facilities to be constructed in Eugene, Oregon. <br />Korean portion included coordination of U.S. based design teams <br />providing planning and design for new DRAM fabrication facility in <br />Inchon, ROK. U.S. program included management of turn-key D-B team <br />(U.S., German and Korean design team) and the U.S./German ].V. <br />Construction team. Each plant was 300,000 SF with 100SF class 10 clean <br />rooms. Team representative to Korca as project trade represcntative <br />with Korean vendors and manufactures. <br /> <br />c <br /> <br />Senior Program Construction Manager <br />GM de Mexico, Engine Plant Expansion, Monterey, Mexico <br />Program Manager for thc $45 million Plant Expansion. Provided Owncr's <br />CM oversight of the dcsit,'11 and construction teams involved in the plant <br />expansion. Hired local Mexican design engineering firms for design <br />ovcrsight. CM services includcd on site quality control, cost and schedule <br />oversight reprcscntatives. <br /> <br />Special Training <br />CCM - Certified Construction Manager, 2005 <br />Licensed Architect Sta te of Arizona #13475 (inactive), 1982 <br />LEED Certified Training for LEED AP 2009 <br />URS Project Management Certification <br />URS Field Construction Safety ccrtificd <br /> <br />Professional Societies/Affiliates <br />Cl'vf.A,A Member <br />Past President, 2006 South Florida CMAA Chapter <br /> <br />-'" <br /> <br />..... <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.