My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
URS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:39:17 AM
Creation date
8/30/2011 11:38:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Services including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach: Special Inspection Services <br />RFO No. 11-07-11 <br /> <br />. .ino Medina Material Testing Scheduling of field inspectors for Construction <br /> Material T estin Services re uired for projects. <br />Brett Oldford, P.E. Civil Engineering Lead Prime Management and Design of All General Civil Tasks <br /> (PGD, Roadways, Water, Waste Water Utilities, barrier <br /> island draina e and Stormwater desi n <br />Raj Shanmugam, P.E. 26 Transportation Consulting Prime Management of all traffic and roadway design including <br /> Lead Traffic Studies, Site Impact Studies, ROW Analysis, <br /> Paving Designs and Signalization Designs and review <br /> of Contractor MOT submittal lans. <br />Dale Wiley, P.E. 33 Mechanical Engineering Prime Management / Design oversight of mechanical design <br /> Lead including HVAC, fire protection, potable water, pumping <br /> s stems, pipin ,etc. <br />Chin Li, P.E. 16 Electrical Engineering Sub Management / Design oversight of electrical <br /> Lead engineering including load analysis, T&D evaluation, <br /> Ii htin , roundin ,etc. SBE/WMBE <br />Thomas Mullin, P.E. 45 Geotechnical Engineering Prime Geotechnical Engineering consulting and management <br /> Lead / oversight of subsurface investigations and laboratory <br /> testing and provision of Geotechnical Engineering <br /> recommendations <br /> <br /> <br /> <br /> <br />c <br /> <br />These seasoned professionals have a very clear understanding of the elements and tasks required by <br />permitting agencies and regulatory agencies governing the construction of the Sunny Isles Beach pier and <br />restaurant construction project. Each of them are well familiar and experienced with the required permitting <br />processes including requirements from MDC resolutions and ordinances and State of Florida Building Codes <br />and the necessary coordination required to address those permit related issues. <br /> <br />URS' proposed engineering and design professionals are also highly experienced in supplying consulting <br />services that may require special inspector field observation of construction work including review / oversight <br />of submittal material presented by contractor for review by the projects EOR. <br /> <br />Resumes of key personnel detailing their relevant experience and qualifications are also included in this <br />section. <br /> <br />/""' <br />~ <br /> <br />3-6 I P 2. g E <br /> <br />URS <br />
The URL can be used to link to this page
Your browser does not support the video tag.