Laserfiche WebLink
<br />City of Sunny Isles Beach: Special Inspection Services <br />RFO No. 11-07-11 <br /> <br />. .ino Medina Material Testing Scheduling of field inspectors for Construction <br /> Material T estin Services re uired for projects. <br />Brett Oldford, P.E. Civil Engineering Lead Prime Management and Design of All General Civil Tasks <br /> (PGD, Roadways, Water, Waste Water Utilities, barrier <br /> island draina e and Stormwater desi n <br />Raj Shanmugam, P.E. 26 Transportation Consulting Prime Management of all traffic and roadway design including <br /> Lead Traffic Studies, Site Impact Studies, ROW Analysis, <br /> Paving Designs and Signalization Designs and review <br /> of Contractor MOT submittal lans. <br />Dale Wiley, P.E. 33 Mechanical Engineering Prime Management / Design oversight of mechanical design <br /> Lead including HVAC, fire protection, potable water, pumping <br /> s stems, pipin ,etc. <br />Chin Li, P.E. 16 Electrical Engineering Sub Management / Design oversight of electrical <br /> Lead engineering including load analysis, T&D evaluation, <br /> Ii htin , roundin ,etc. SBE/WMBE <br />Thomas Mullin, P.E. 45 Geotechnical Engineering Prime Geotechnical Engineering consulting and management <br /> Lead / oversight of subsurface investigations and laboratory <br /> testing and provision of Geotechnical Engineering <br /> recommendations <br /> <br /> <br /> <br /> <br />c <br /> <br />These seasoned professionals have a very clear understanding of the elements and tasks required by <br />permitting agencies and regulatory agencies governing the construction of the Sunny Isles Beach pier and <br />restaurant construction project. Each of them are well familiar and experienced with the required permitting <br />processes including requirements from MDC resolutions and ordinances and State of Florida Building Codes <br />and the necessary coordination required to address those permit related issues. <br /> <br />URS' proposed engineering and design professionals are also highly experienced in supplying consulting <br />services that may require special inspector field observation of construction work including review / oversight <br />of submittal material presented by contractor for review by the projects EOR. <br /> <br />Resumes of key personnel detailing their relevant experience and qualifications are also included in this <br />section. <br /> <br />/""' <br />~ <br /> <br />3-6 I P 2. g E <br /> <br />URS <br />