My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
URS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:39:17 AM
Creation date
8/30/2011 11:38:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Services including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach: Special Inspection Services <br />RFO No. 11-07-11 <br /> <br />/" <br />~ <br /> <br />The following is a tabulation of the key discipline lead technical professionals who will be assigned to this <br />contract, their titles, level of responsibility and identifying resource as either prime (URS) or subconsultant. <br /> <br />( <br /> <br /> Yrs. Prime <br />Name Exp. Title/Position Or Project Responsibility <br /> Sub <br />Jose Polo, P.E. 24 Project / Construction Prime Project Manager, on-site construction administration <br /> Manager services, direct interface with City's PM, Design <br /> Consultants and Contractors. Provides and <br /> coordinates on-site observations, review of testing / <br /> inspection reports, oversight of Project Budget & <br /> Schedules, Submittal & RFI Logs and Project <br /> Reporting to team and City <br />Thomas Mullin, P.E. 45 Principal - In -Charge Prime Client Quality Assurance, Contract Resolution, <br /> Resource Allocation of URS team services. Senior <br /> Manager in charge of Engineering Consulting <br /> Services Including Geotechnical & Testing Services <br /> for Projects. <br />David Wilson, CCM 30 Senior PM/CM Services Prime Oversight Management of Execution of All PM/CM <br /> Manager Services & Tasks; Construction Administration & <br /> Project Management tasks. Management oversight of <br />...... all vertical/facility PM/CM Services. <br />"'Oaryl Jones 25 Sr. Geotechnical and Prime Piling and infrastructure/structural inspector. <br /> Piling/Construction Experienced and capable of functioning in an <br /> Inspector Assistant PM role <br />Keith Stannard 17 Environmental Permitting/ Prime Manage and coordinate for City the submittal and <br /> Processing Support processing of required project permitting for <br /> environmental agencies (FDEP, DERM, EPA, COE, <br /> SFWMD FWS, MDC AHJs). <br />Jesse Richterkessing 14 Bridge Design & Review Prime Project oversight of Bridge design, geotechnical, civil, <br />P.E. Lead structural engineering reviews and on-site <br /> construction, materials testing and <br /> observation/reporting. <br />Michael Sharp, P.E. 28 Geotechnical & Prime Project on-site inspections for geotechnical / <br /> Foundation / Pier foundations / piers and oversight of required testing / <br /> Inspections & Testing reports. Preparation of project construction <br /> observation reports. <br />Jim Nadaskay, P.E. 31 Structural & Special Prime Management of required Special Inspections and <br /> Inspections, Structural construction structural inspections. Design review <br /> Engineering Lead oversight of structural engineering evaluations, wind <br /> load analysis, structure hardening and foundation <br /> design. <br />Alfredo Budik, P.E. 22 Soil Borings / Laboratory Sub Soil boring and laboratory testing reports for projects. <br />-- T estinq <br /> <br />c <br /> <br />3-5 I P ::; g '= <br /> <br />URS <br />
The URL can be used to link to this page
Your browser does not support the video tag.