My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
URS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:39:17 AM
Creation date
8/30/2011 11:38:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Services including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />c <br /> <br />c <br /> <br />c <br /> <br />City of Sunny Isles Beach: Special Inspection Services <br />RFO No. 11-07-11 <br /> <br />The current URS South Florida workload in this depressed economic times is such that we can readily engage <br />and complete the anticipated work of this RFP without the need to solicit additional professional staff. On <br />average, URS offices strive to maintain a staff utilization rate of 75:1:%, which provides significant reserve <br />capacity to accommodate significant additional workload. <br /> <br />Projected <br />Staff <br />Utilization <br /> <br /> <br />3.3 <br /> <br />100 <br />90 <br />80 EXISTING <br />70 ASSIGNMENTS/CONTRACTS <br />60 <br />50 <br />40 <br />30 <br />20 <br />10 <br />0 <br /> Aug Sep Oct Nov Dec Jan Feb Mar Apr May June July <br /> 2011 2011 2011 2011 2011 2012 2012 2012 2012 2012 2012 2012 <br /> <br />URS TEAM ROLES AND RESPONIBILlTIES OF KEY STAFF / SERVICES <br /> <br />The URS team of engineering, construction and design professionals we assembled for this RFP have <br />extensive experience in the evaluation / analysis, planning / studies and reviews as well as the development of <br />reports, plans/ contract documents that are bid ready and with project and construction management services <br />to support the two projects that are presented in the City's RFQ. <br /> <br />URS' project manager, Mr. Jose Polo, P.E. will serve as the daily single point of contact for the City of <br />Sunny Isles Beach regarding construction management, Special Inspection and engineering support services. <br />Mr. Jose Polo is highly experienced on FDOT bridge projects in providing the various inspections required for <br />such structures and will bring his expertise and experience to bear on the City's projects. Mr. Polo was the PM <br />for the recently completed Bridge of Lion's replacement project in St. Augustine, FL and was also the Lead <br />resident CEI office engineer on the Royale Park Replacement Bridge in downtown West Palm Beach <br />completed in 2007. Mr. Polo, P.E. will be responsible for the coordination of requests to provide <br />engineering support services to the URS Engineering principal-in-charge, Mr. Thomas Mullin, P.E., V.P. <br /> <br />Mr. Mullin will be responsible for the coordination of local office support to provide the appropriate engineering <br />services to the project. He has over 33 years total experience in Geotechnical and Civil Engineering <br />design projects. Mr. Mullin has been responsible for geotechnical evaluations and design work, for a wide <br />variety of projects including foundation design of several ports and harbor facilities, power plant structures, <br />reservoir embankments, transportation facilities, numerous high rise towers, commercial and industrial <br />facilities. <br /> <br />3-4 I P " g e <br /> <br />URS <br />
The URL can be used to link to this page
Your browser does not support the video tag.