My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
URS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:39:17 AM
Creation date
8/30/2011 11:38:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Services including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />URS <br /> <br />Daryl Jones (cont'd.) <br /> <br />,-.. <br />~ <br /> <br />SR 704 Royal Park Replacement Bascule Bridge, West Palm <br />Beach, FL - 1/02 to 01/04 <br />Surveillance and inspection of drilled shafts construction for the SR <br />704 Bascule Bridge over the Intracoastal \X1aterway, \X1est Palm <br />Beach, Florida. Installed over 100 shafts, 4' diameter to depths of <br />up to 35 meters deep. Operated lviini-SID and <br />monitored/reviewed CSL testing data <br /> <br />SR 804 (Ocean Avenue) Replacement Bascule Bridge, <br />Boynton Beach, FL - 1/99 to 6/00 <br />Surveillance and inspection of drilled shafts and pressure grouted, <br />auger pile construction for the SR 804 Bridge over the Intracoastal <br />\X1aterway, Boynton Beach, Florida. Installed over 80 drilled shafts <br />and 50 ACIP piles. Provided CEl of 40 foot high reinforced earth <br />approach embankment construction including monitoring of <br />geotechnical pore pressure cells, settlement plates and slope <br />indicator casings. <br /> <br />,..-- <br />~ <br /> <br />17th Street Causeway Replacement Bascule Bridge, Fort <br />Lauderdale, Florida - 2/98 to 5/98 <br />Surveillance and inspection of drilled test shaft construction for the <br />17th Street Causeway Bridge over the Intracoastal \X1aterway as part <br />of District-wide contract for the testing and analysis of bridge <br />foundations. <br /> <br />SR 20 Replacement Bridge, Blountstown, Florida - 8/96 to <br />3/97 <br />Surveillance and inspection of drilled shaft construction for the SR <br />20 Bridge over the Apalachicola River. Installed over 100 drilled <br />shafts with diameters ranging from 4 to 9 feet to depths up to 100 <br />feet deep. Operated SID and performed slurry density testing. <br /> <br />State Road AlA (MacArthur Causeway), Miami, Florida - <br />12/93 to 3/96 <br />Surveillance and inspection of drilled shaft construction for the <br />MacArthur Causeway Bridge (1-395), Miami, Florida. Project <br />included installation of over 100 large diameter drilled shafts <br />ranging in diameter from 3-1/2 to 7 feet and depths up to 115 feet <br />below water line. <br /> <br />c <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.