Laserfiche WebLink
<br />URS <br /> <br />Daryl Jones (cont'd.) <br /> <br />c <br /> <br />c <br /> <br />. Inspected the installation of methane venting system and <br />synthetic lining placement, sampling and testing, North Broward <br />Resource Recovery Facility (pompano Beach, Florida). <br />· Subdivision development oversight of the \Vest Glen and <br />partial Eagle Trace residential communities in Coral Springs, <br />Florida as well as various commercial properties in Broward <br />County, Florida. Responsibilities included the verification of <br />roadway and building pad grades and densification, surveillance of <br />water line, sewer and drainage placement. Perform lamp light <br />inspections of sewer and drainage lines and monitored pressure <br />tests of water and force main lines. <br />· Responsible for the inspection of construction and <br />installation of deep aquifer injection well, logging, field water quality <br />analysis and water quality sample collection and conducted water <br />level monitoring in shallow and intermediate observation wells <br />during deep well injection testing for South Beaches Project, <br />Brevard County, Florida. <br />· Supervised construction and installation of test water <br />supply wells, in addition to collecting pumping test data which was <br />used to support a water supply study in Broward County, Florida. <br />· Assisted in the performance of asbestos facility survey <br />(AI-IERA) for Monmouth County School Board, all 1(-12 schools <br />in Monmouth County, New Jersey. <br /> <br />Major FDOT Bridge and High Rise Drilled Shaft <br />Foundation Projects <br /> <br />SR No. AlA, Bridge of Lion's Bascule Bridge Rehabilitation, <br />St. Augustine, FL - 8/06 to 12/07 <br />FDOT District II <br />FDOT Construction Project Manager: Jeff Williams (561) 366-6800 <br />Surveillance and inspection of drilled shafts construction for the SR <br />AlA Bascule Bridge Rehabilitation over the Intracoastal <br />\Vaterway/Matanzas River, S1. Augustine, Florida. Installed 140 <br />shafts varying from 3' to 8' in diameter to depths of up to 135 feet <br />deep. Operated Mini-SID and monitored/reviewed CSL testing <br />data. <br /> <br />c <br /> <br />Quantum High Rise Condominium Project, Miami, Fl - <br />06/04 to 02/05 <br />Terra Group International <br />Cons truction Manager: Jorge Fuen tes <br />Surveillance and inspection of drilled shaft construction for twin 45 <br />to 54 story high condominium towers. Installed 210 high capacity <br />drilled shafts varying in diameter from 3' to 5' to depths of up to <br />145' below the ground surface. Installed and monitored/reviewed <br />CSL testing data for mono shafts beneath highly loaded columns <br />for the tower. <br /> <br />3 <br />