Laserfiche WebLink
<br />URS <br /> <br />Daryl Jones (cont'd.) <br /> <br />c <br /> <br />c <br /> <br />. Supervision and inspection of cast-in-place (pressure <br />grouted auger) piles at numerous projects throughout South Florida <br />including North Broward County Resource Recovery Facility <br />(pompano Beach), Towers at Mullet Bay (Saint ~1aarten, <br />Netherlands Antilles), and Crystal Palace Expansion (Nassau, <br />Bahamas). <br />. Supervision, installation and monitoring of settlement <br />casing at City of Fort Lauderdale's Composting Facilities. <br />Surveillance and inspection of augercast pile installation for the 44- <br />story Diamond "C" Condominium in South Miami Beach, Florida <br />. Directed field geotechnical studies for the 2,500 acre, <br />3,000 :tvf\'V' FPC Polk County Power Plant Site <br />. Responsible for heading field work for subsurface <br />exploration for Disney's Studio Tour, Disney Center Hotel and <br />Convention Facility at Walt Disney World in Orlando, Florida Co- <br />directed engineering soil boring program, performance of <br />geophysical survey of soil samples collected in conjunction with <br />FDOT State Proposal for Super Conducting Super Collider <br />(Nassau County, Florida) <br />. Supervision and inspection of drilled shaft (caisson) <br />foundations Martinigue 1I Condominium (Singer Island, Florida) <br />· Supervision of driven prestressed concrete piles, <br />Sawgrass Industrial Park Bridge at S.R. 84 (Fort Lauderdale, <br />Florida) and North Broward County Resource Recovery Facility <br />(pompano Beach) <br />. Inspection of cast-in-place step taper piles, Sun Bank <br />Center (Orlando, Florida) <br />. Performance of numerous pile load tests in compression, <br />tension and lateral loading <br />· Surveillance and inspection of site improvement using <br />vibroflotation stone columns for fuel storage tanks constructed <br />over soft hydraulic fill and bay bottom sediments at I-lookers Point, <br />Tampa, plus 266,000 barrel LNG storage tank in Salley, South <br />Carolina. <br />. Surveillance and inspection of site improvement by <br />means of demucking and backfilling, degrubbing, and detrashing at <br />numerous projects throughout South Florida. <br />· Performance of nondestructive pile integrity testing on <br />cassions at MacArthur Causeway (1-395) and auger pressure grouted <br />piles at Diamond "c" Condominium, iv1iami, Florida. <br />. In conjunction with the environmental remediation at <br />the Petro Chemical Products plant in Jacksonville, Florida, directed <br />the excavation, restoration, and deployments of erosion control <br />systems along 3/4 miles of drainage tributary to St. Johns River. <br />· Responsible for placement of settlement plates and <br />monitoring of surcharge settlement at Falconara II Condominiums <br />(Singer Island, Florida) and Mystic Pointe (North Miami, Florida). <br /> <br />c <br /> <br />2 <br />