Laserfiche WebLink
<br />URS <br /> <br />Thomas F. Mullin, PE (cont'd.) <br /> <br />c <br /> <br />Lead Geotechnical Consultant, Watermain System Upgrade, Town <br />of Palm Beach FI, 2001). Directed geotechnical field investigation <br />programs and engineering analysis for the geotechnical design of the <br />Towns watermain system. Geotechnical design work included two(2) long <br />directionally drill pipelines beneath the ICY'(1W. <br /> <br />Lead Geotechnical Consultant for the Hovensa Refinery WWTP, <br />Expansion, St. Croix, USVI (2006). Directed geotechnical field <br />investigation programs and engineering analysis for the foundation design <br />and construction development of the project. Provided construction <br />phase engineering support for QCQM services related to foundation <br />improvements and installation, site earthworks construction and pile load <br />test1l1g programs. <br /> <br />Project Geotechnical Consultant for the Southern Region WWTP, <br />Palm Beach County, Florida (1990 - 1992). Directed geotechnical field <br />investigation programs and engineering analysis for the construction <br />development of the project. Provided construction phase QCQM services <br />related to foundation improvements and construction, civil earthworks, <br />pile load testing and installation and surcharging programs. <br /> <br />c <br /> <br />Lead Geotechnical Consultant, D-12 Pump Station and Stormwater <br />System Improvements, Town of Palm Beach FI, (2000 -2001). <br />Directed geotechnical field investigation programs and engineering <br />analysis for the geotechnical design of the Towns new 1)-12 Pump Station <br />and related stormwater system upgrades. <br /> <br />Power Plants/Heavy Industrial Projects <br /> <br />Foundation designs for spread footings and driven piling for the Hess <br />Oil FCC Refinery Expansion and LPG Storage Tank in St. Croix, <br />U.S. Virgin Islands. <br /> <br />Principal geotechnical consultant for the preliminary design of the Coke <br />Processing/Handling Expansion Project, Hess Oil Refinery, U.S. <br />Virgin Islands <br /> <br />Lead investigator for extensive geotechnical studies for the 3,000 acre, <br />3,000 MW, FPC Hines Energy Electric Generating Station. <br />Investigated 25 + miles of dams, 8 clay setting areas and 4 mined areas for <br />development into a power plant generating station and cooling reservoir <br />areas, Polk County Florida. Developed site earthwork, dewatering, soil <br />cement and earthwork testing specifications. <br /> <br />Project Consultant for geotechnical analysis and reporting for the <br />Arcadian Ammonia Plant #4, Point Lisas, Trinidad. <br /> <br />c <br /> <br />Directed and evaluated Quality Control Inspection and Testing of <br />Augered Pressure Grouted Piles and Synthetic Liners/Methane Collection <br />