Laserfiche WebLink
<br />URS <br /> <br />Thomas F. Mullin, PE (cont'd.) <br /> <br />,.. <br />~ <br /> <br />Principal Geotechnical Consultant for the SFWMD ENR Test Cells, <br />Palm Beach Co., Fl (1997 - 1999). Managed the geotechnical <br />investigation analysis and re-design for 2, 15 acre test cell sites for the <br />Everglades Nutrient Removal Project. Existing test cells were found by <br />full scale field tests to leak excessively therein potentially invalidating <br />planned nutrient uptake research in the cells. Civil design plans and <br />specifications were developed and provided to re-construct the cells with <br />an impermeable synthetic HDPE liner. Provided construction phase <br />engineering design support. <br /> <br />Principal Geotechnical Consultant For The Peer Design Review Of <br />SFWMD Stormwater Treatment Areas 1W, 5 and 6, Palm Beach <br />County, FI (1997- 1999). Provided geotechnical Peer Reviews of <br />geotechnical analyses and designs by others for 3 S'L\s. Also provided <br />construction expert claims and litigation support during the post <br />construction phase of the project. <br /> <br />c <br /> <br />Lead Geotechnical Consultant for The 720 Acre Phase I Cooling <br />Pond, Florida Power Corporation Hines Energy Complex, Polk <br />County, Florida (1994 - 1998). Managed geotechnical field investigatjon <br />programs and cngineering analysis [or thc development of a 720 Ac <br />cooling pond and 310 Ac plant site area [or Phase 1 1000 M\V capacity of <br />a 3000 MW power generating facility. Provided desit,>n input to the Plant <br />Certification Application. Overviewcd the dcvelopment o[ civil desit,>ns <br />and specifications and providcd construction phase cnginecring support. <br /> <br />Lcad Consultant For Hydrogeology and Modflow Modeling Studies <br />for the Lakes Of Sherbrook Commercial And Residential <br />Developments, Lantana, Florida (1993 - 1995). Directed model <br />developmcn t and analysis and DEP permitting [or cons truction phase <br />dewatering o[ the infrastructure adjacent to the old unlincd Lantana <br />landfill. Directed construction phasc WQ sampling to vcrify compliance <br />of no impact on groundwater contamination plumes beneath the landfill. <br /> <br />Lcad Consultant For Hydrogeology And Modflow Modeling <br />Studies V.A. Medical Center, West Palm Beach FI (1994 - 1998), <br />Dirccted Hydrogeology and Modflow Modeling studies, contamination <br />assessments and prcpared remediation plans for site dewatering, <br />permittjng and contamination remediation. Directed construction phase <br />\VQ sampling to verify compliance of no impact on groundwater <br />contamination plumes beneath the landfill. <br /> <br />Representative WaterlWastewater Proiects <br /> <br />c <br /> <br />Lead Geotechnical Consultant, Lake Boynton Estates, City of <br />Boynton Beach, FI, 2009). Directed geotechnical field investigation <br />programs and engineering analysis to provide geotechnical design input <br />for the Estates watermain system improvements. <br />