Laserfiche WebLink
<br />URS <br /> <br />Jose R. Polo, PE (cont'd.) <br /> <br />,........... <br /> <br />~ <br /> <br />arrangement for the west side approach is a three span unit consisting of <br />spans of 39.0m, 36.570m, and 30.543m with the longest span adjacent to <br />the bascule span. The east side approaches consist of a five span unit with <br />spans of 39.0m, 36.570m, 31.045m, 25.175m, and I8.738m. The total <br />length of each bridge is 332.641m. l\fr. Polo began as the Roadway <br />Project Manager and his duties included inspection of roadways, drainage, <br />and lighting. He was promoted to Senior Project Engineer and was <br />assisted with the final estimate package and closing out the job. <br /> <br />Project Engineer, Royal Palm Way, FDOT District Four, Palm <br />Beach County, Florida (04/03-03/04): Responsible for the <br />reconstruction and milling and resurfacing of Royal Palm \V'ay in the town <br />of Palm Beach. Project includes new roadway construction, drainage <br />system, geogrid placement, composite base, milling and resurfacing, <br />superpave asphalt, friction course, parking lot, hardscape/landscape, <br />signalization and signing. <br /> <br />,..-.... <br />W <br /> <br />Project Engineer, Milling and Resurfacing Project (MP 274.2-MP <br />275.9), Florida's Turnpike Enterprise, Lake County, Florida (03/01- <br />06/01): Work on this design-build project consisted of milling, cross <br />slope correction, resurfacing with Supcrpave and Friction Course (FC-5) <br /> <br />and shoulder rework to avoid drop-off conditions. <br /> <br />Office Engineer, 1-95 (Okeechobee Boulevard) Interchange, MK <br />Centennial, FDOT District Four, Florida (11/97-02/01): Worked in a <br />joint effort with URS and MK CentCl1nial, Inc. for a FDOT highway and <br />bridge project. Monitored construction progress; prepared supplemental <br />agreements, work orders, change orders, monthly progress estimates <br />reports, and final estimate package following FDOT guidelines; input <br />material testing reports in CQR; and kept records of all quantity <br />deviations from original (Juantity using electronic spreadsheets such as <br />Excel, Lotus, and Expedition Database. <br /> <br />Office Engineer, Lejeune Road Interchange CEI, FDOT District <br />Six, Miami, Florida (06/95-11/97): Served as Office Engineer for the <br />construction of new ramps between SR 836 and N\V' 45th Avenue and <br />the reconstruction of SR 836, LeJ eune Road and the vicinity of the Miami <br />International Airport. Monitored construction progress, recorded material <br />quantities, maintained daily records; prepared computerized weekly and <br />monthly estimates using Lotus software; checked calculations of <br />computation book and daily construction progress; kept records of all <br />deviations from original contract quantity; and prepared final estimate <br />package. <br /> <br />c <br /> <br />3 <br />