Laserfiche WebLink
<br />,,-- <br />~ <br /> <br />Areas of Expertise <br /> <br />r <br />w <br /> <br />H.e~oh-ing Enyironmcntal <br />Rcgulaton' 1~~ues, I\Iarinc and <br />Terreqrial Habitat ,-\ssessmel1ls ,1I1d <br />Impact .-\nah's('~, Natural <br />Community l\Iapping. \'\etland <br />Delinea tions / Functiona] <br />.\sseooments. Protected ],']oral and <br />Faunal Species .\ ~~essmelH~, <br />Offshore and Nearshore Benthic <br />Resuurce ,\ssessmelHs, Fsscntial <br />h~h Habitat .-\sscs~lHenr~, ~ectlon 7 <br />Consultation, Protected Spccie~ <br />Permitting and Relocatiun~. <br />Federal/State /I.oGtl . \genc\ <br />!':n,'ironmenta] Res(lurce <br />Pcrmirting, Secundan' and <br />CUl11ulatin' 1mpacl ,\nah~('s. <br />l\Iarine & !'resh\\'ater \\'c't!and <br />\Iitigation Planning and De~ig!1. <br />l\Iitigalion Conslrucljo!1 On'r~ight <br />and l\ Ie miluring, Specie~ <br />CO!1sernltion l\leasures, <br />Fm'ironll1l'nlal Permit Cumpliance. <br />I':rosion Control. N j.:P. \ Studies <br />(C\TEX. E.\, l!lS. PD&F-:, etc.). <br />Cons tructiull Feasibilin' Studies, <br />Protected Land l\fanagCl11el1l Plan~, <br />De~ign Plan Reyic\\'s, l\[alerial <br />ReC\cling/Solid \\a~te hcdin' <br />Permitting, \\ 'ater Quali n' <br />,\ ssessments and Contamina tion <br />,\ sse~~ments <br /> <br />Years of Experience <br /> <br />\\ith UZS: 111 Year~ <br />\\'ith Other hrl11~: '7 Years <br /> <br />Education <br /> <br />c <br /> <br />Craduate Srudil's 19<J-l-- 19%. <br />Coastal !.one !\lgl11t./l\Ianne <br />Biolog:'.:\:Sl' Oceanographic <br />Center <br />B.S, Degree 19<) I, BiologICal <br />Scil'nces. SL'N'y' at StOll\' Brook <br /> <br />URS <br /> <br />Keith Stannard <br />Environmental Project Manager <br /> <br />Overview <br /> <br />!vir. Stannard has over 17 years of experience in conducting and managing <br />professional ecological investigations required for environmental <br />assessment of a wide variety of public and private sector projects <br />including linear facilities (roadways, railways, pipelines), site development <br />(industrial, residential, mixed-use) and special-purpose projects (offshore <br />facilities, marinas, dams, maintenance dredging, basin studies, etc.). He <br />has an in-depth knowledge of federal, state and local environmental <br />regulatory criteria and associated agency procedures in relation to NEP A <br />and environmental resource permitting. He also has extensive experience <br />with marine and terrestrial wetland ecology; wetland mitigation; <br />threatened and endangered species conservation protocols and Section 7 <br />consultation. <br /> <br />Project Specific Experience <br /> <br />Lead Biologist, Cape Sable Canals Dam Restoration Project, <br />Everglades National Park, National Park Service (2008-Present): <br />Lead biologist responsible for preparation of an Environmental <br />Assessment (EA) [or the restoration of two breached dams in Cape Sable, <br />ENP. Tasks include NPS/ENP internal scoping, public and agency <br />scoping/ consultation, data collection, data analysis, preparation of the EA <br />and FONSI. <br /> <br />Project Manager, Tamiami Trail Vista Clearing Mitigation <br />Feasibility Study, FDOT, District VI and Everglades National <br />Park/National Park Service (2008): Conducted a mitigation feasibility <br />analysis to determine the potential benefit of utilizing the NPS-planned <br />lO-mile vista clearing project as mitigation to compensate for a portion of <br />the proposed freshwater wetland impacts associated with the FDOT's <br />Krome Avenue widening project. <br /> <br />Project Manager, Compressor Station Contamination Assessments, <br />Phase VIII Expansion, Florida Gas Transmission (2008-Present): <br />Project Manager responsible to conduct Phase I contamination <br />assessments and title searches for the proposed expansion of four existing <br />compressor stations (CS 11-14) and one new compressor station (CS 29) <br />associated with the Phase vnl Expansion program. <br /> <br />Project Manager, Hydrogeologic Study-Archbold Biological Station, <br />Greenfield #3 Lateral, Phase VIII Expansion, Florida Gas <br />Transmission (200S-Present): Project Manager responsible to conduct <br />a hydrogeologic investigation to model potential impacts to the flow of <br />groundwater between Lake Annie (Archbold Biological Station) and Lake <br />Placid as a result of constructing a new pipeline lateral between the two <br />lakes just north o[ SR 70 in the Lake Wales Ridge area. <br />