<br />Keith Stannard, (contd)
<br />
<br />c
<br />
<br />c
<br />
<br />Project Manager, Miami Lateral, Florida Gas Transmission
<br />Company (2005-2007): Project Manager for environmental-related tasks
<br />associated with installation and operation of pig launcher and receiver
<br />facilities along FGT's existing pipeline lateral in Miami, Florida. Tasks
<br />include conducting wetland and T&E species assessments, cultural
<br />resource assessments, preparation of FERC clearance letters to USF\X!S,
<br />DCA and SHPO, contamination assessments (phase I and Phase II),
<br />regulatory agency coordination, applying for and obtaining a Class V
<br />Dewatering permit through Miami-Dade County DEIUvf, MOT plans
<br />preparation with a lane closure analysis and permitting through FDOT.
<br />1-\dditional tasks include conducting an environmental issues review and
<br />an issues map using GIS for the entire lateral to preliminarily identify
<br />environmental issues prior to conducting the smart pig test for possible
<br />pipeline anomalies due to the requirements of the USDOT Office of
<br />Pipeline Safety, agency coordination, and applying for after-the-fact
<br />permits where impacts to environmental resources are unavoidable.
<br />
<br />Project Manager, SR 91/Florida's Turnpike Mainline Relocation
<br />Phase I, II and III, Broward County, Florida Gas Transmission
<br />Company (200S-Present): Task Manager for environmental-related
<br />tasks associated with relocating three scgments of FGT's mainline
<br />pipelinc along SR 91/Florida's Turnpike in Broward County, Florida.
<br />Tasks include conducting wetland and T&E species assessments,
<br />preparation of FERC clearance letters to USF\X!S, DCA and SHPO,
<br />contamination assessments (Phase I and II), groundwater well installation
<br />in proximity of a superfund site (Florida Petroleum Reprocessors), trench
<br />dewatering sampling, well monitoring, and applying for FDEP ERPs,
<br />USACE Section 404 Pennits, and Broward County Environmental
<br />Resource and Dewatering Licenses.
<br />
<br />Project Manager, Misc. Minor Projects, Florida Gas Transmission
<br />Company, 2003-Present: Project Manager and task leader for various
<br />minor pipeline and compressor station projccts in Southeast Florida.
<br />Tasks includc Federal, State and local agency environmental resource and
<br />dewatering permitting, wetland evaluations, cultural resources
<br />assessments, contamination assessments (Phase I and II), ground water
<br />and soil sampling and analyses, contamination remediation, air
<br />sampling/ monitoring, dewatering sampling/monitoring, MOT plans
<br />preparation and permitting, threatened and endangered species surveys,
<br />long-term mitigation monitoring, pipeline relocation construction
<br />oversight/inspections, permit compliance, and environmental feasibility
<br />studies for new potential pipeline routes and compressor station locations.
<br />
<br />Project Manager, Port Everglades Lateral, Broward County, Florida
<br />Gas Transmission Company (2003-2007): Project Manager for
<br />environmental-related tasks associated with installation and operation of a
<br />pig launcher facility and right-of-way maintenance activities along FGT's
<br />existing pipeline lateral in Broward County, Florida. Tasks include
<br />conducting wetland and T&E species assessments, cultural resource
<br />assessments, preparation of FERC clearance letters to USF\X!S, DCA and
<br />SHPO, contamination assessments (phase I and II), and applying for and
<br />obtaining federal, state and local environmental permits for pipeline right-
<br />