Laserfiche WebLink
<br />URS <br /> <br />Keith Stannard, (contd) <br /> <br />c <br /> <br />c <br /> <br />Project Manager, Miami Lateral, Florida Gas Transmission <br />Company (2005-2007): Project Manager for environmental-related tasks <br />associated with installation and operation of pig launcher and receiver <br />facilities along FGT's existing pipeline lateral in Miami, Florida. Tasks <br />include conducting wetland and T&E species assessments, cultural <br />resource assessments, preparation of FERC clearance letters to USF\X!S, <br />DCA and SHPO, contamination assessments (phase I and Phase II), <br />regulatory agency coordination, applying for and obtaining a Class V <br />Dewatering permit through Miami-Dade County DEIUvf, MOT plans <br />preparation with a lane closure analysis and permitting through FDOT. <br />1-\dditional tasks include conducting an environmental issues review and <br />an issues map using GIS for the entire lateral to preliminarily identify <br />environmental issues prior to conducting the smart pig test for possible <br />pipeline anomalies due to the requirements of the USDOT Office of <br />Pipeline Safety, agency coordination, and applying for after-the-fact <br />permits where impacts to environmental resources are unavoidable. <br /> <br />Project Manager, SR 91/Florida's Turnpike Mainline Relocation <br />Phase I, II and III, Broward County, Florida Gas Transmission <br />Company (200S-Present): Task Manager for environmental-related <br />tasks associated with relocating three scgments of FGT's mainline <br />pipelinc along SR 91/Florida's Turnpike in Broward County, Florida. <br />Tasks include conducting wetland and T&E species assessments, <br />preparation of FERC clearance letters to USF\X!S, DCA and SHPO, <br />contamination assessments (Phase I and II), groundwater well installation <br />in proximity of a superfund site (Florida Petroleum Reprocessors), trench <br />dewatering sampling, well monitoring, and applying for FDEP ERPs, <br />USACE Section 404 Pennits, and Broward County Environmental <br />Resource and Dewatering Licenses. <br /> <br />Project Manager, Misc. Minor Projects, Florida Gas Transmission <br />Company, 2003-Present: Project Manager and task leader for various <br />minor pipeline and compressor station projccts in Southeast Florida. <br />Tasks includc Federal, State and local agency environmental resource and <br />dewatering permitting, wetland evaluations, cultural resources <br />assessments, contamination assessments (Phase I and II), ground water <br />and soil sampling and analyses, contamination remediation, air <br />sampling/ monitoring, dewatering sampling/monitoring, MOT plans <br />preparation and permitting, threatened and endangered species surveys, <br />long-term mitigation monitoring, pipeline relocation construction <br />oversight/inspections, permit compliance, and environmental feasibility <br />studies for new potential pipeline routes and compressor station locations. <br /> <br />Project Manager, Port Everglades Lateral, Broward County, Florida <br />Gas Transmission Company (2003-2007): Project Manager for <br />environmental-related tasks associated with installation and operation of a <br />pig launcher facility and right-of-way maintenance activities along FGT's <br />existing pipeline lateral in Broward County, Florida. Tasks include <br />conducting wetland and T&E species assessments, cultural resource <br />assessments, preparation of FERC clearance letters to USF\X!S, DCA and <br />SHPO, contamination assessments (phase I and II), and applying for and <br />obtaining federal, state and local environmental permits for pipeline right- <br /> <br />c <br />