My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tally Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
Tally Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 2:27:13 PM
Creation date
8/30/2011 2:26:27 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Svcs including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.., <br /> <br />. <br /> <br />. <br /> <br />MICHAEL K. MUCHARD, P.E. <br />PRINCIPAL GEOTECHNICAL ENGINEER <br /> <br />MAJOR PROJECTS (CONT'D) <br /> <br />~ <br /> <br />., <br /> <br />..., <br /> <br />. <br /> <br />Links 1 and II (Spruce Street Interchanl!e and 1-275 Wideninl!), Tampa, FDOT. Responsible AFT <br />Engineer for performing pDA, CApW AI' and WEAP analysis on numerous prestressed piles (approximately 50 <br />tested to date). Performed numerous static tension tests (approximately 6 piles tested). CSL testing on non- <br />redundant drilled shafts (Links II). <br /> <br />, <br />. <br /> <br />. <br /> <br />1-75 Desil!n/Build/Finance, Several Counties in Southwest Florida, FDOT - 24 bridge structures over <br />30 mile section of interstate highway construction with innovative contracting method. Responsible <br />geotechnical engineer for construction phase of foundations. Performed Smart Pile. pDA. CApW AI' and <br />WEAl' analysis of 65 test piles. Provided pile lengths, driving criteria recommendations and problem solving <br />of various construction challenges. <br /> <br />r"'J <br /> <br />., <br />. <br /> <br />., <br />. <br /> <br />1-10 Bridl!e Replacement over Lake Ponchartrain, Louisiana DOTD - Replacement ofa major four <br />mile bridge damaged by hurricane Katrina. Responsible for implementation of extensive load test program <br />utilizing 36" square prestressed concrete piles. Installed embedded strain instrumentation in piles at casting yard, <br />perfonned 10 ST ATNAMICTM axial load tests to 2500 tons and also four(4)- 350 ton STA TNAMICTM lateral load <br />tests. <br /> <br />.., <br /> <br />APM Marine Terminal, Portsmouth. Virl!inia - One of the largest port facilities constructed in recent <br />history. Project included over one thousand 36 inch and 54 inch diameter, post tensioned, spun cast, <br />concrete cylinder piles. Installed multiple levels of strain instrumentation in eleven (II) test piles. <br />Monitored the embedded gages during post tensioning of the piles than again during pile driving and load <br />testing. Perfomled Axial ST A TNAMIC load tests up to 3,000 tons on all eleven (II) test piles. Eight test <br />piles were installed and load tested prior to any production piles and three additional production piles were <br />load tested to verify final pile installation criteria. Also performed pDA, CApW AI' and WEAl' on upwards <br />of 50 production piles. Due to extensive testing program perfomled by AFT, pile design loads were pushed <br />to the envelope resulting in significant savings to the owner. <br /> <br />., <br />. <br /> <br />.., <br /> <br />. <br /> <br />. <br /> <br />., <br /> <br />US 17 Wilminl!:ton Bvpass over Cape Fear River -Wilminl!:ton, North Carolina NCOOT - AFT Responsible <br />Engineer. Perfonned 13 STA TNAMICTM axial load tests. World record 1.056 ton lateral STATNAM/CTM load test on <br />a pair of 84 inch diameter drilled shafts. Perfonned 8 STA TNAM/CTM lateral load tests on pile groups (with 139 <br />strain gages). Performed static lateral load tests on pipe piles. drilled shalls. strain instrumented spun cast concrete <br />cylinder piles and square prestressed concrete piles. Crosshole Sonic Logging CSL testing on over 50 drilled shafts. <br /> <br />. <br /> <br />.., <br /> <br />..., <br /> <br />Cooper River Bridl!:e, Charleston, South Carolina SCOOT - AFT Responsible Engineer. Performed strain <br />instrumentation and drilled shall inspections with Mini-SID on 12 drilled shafts, perfonned four 3600 ton axial <br />STATNAM/CTM load tests, 24 lateral STATNAAflCTM tests. 3 static lateral load tests. monitored 8 Osterberg load <br />tests. installed and monitored over 100 electronic piezometers during blast induced soilliquification. <br /> <br />. <br /> <br />. <br /> <br />...., <br /> <br />Brvant Patton Bridl!:e Sf Georne Island. Apalachicola. FOOT - Four mile bridge connecting US 98 to St. George <br />Island. Involved in both the foundation repair contract and subsequent Design Build replacement bridge. Perfonned <br />PDA testing. CApW AI' and WEAl' analysis of 20 test piles during repair contract. 24 concrete piles were driven <br />through existing bridge to construct crutch bents. During design/build contract responsible for implementation of <br />extensive load test program utilizing 54" spun cast cylinder piles. Installed embedded strain instrumentation in piles <br />at casting yard. perlonned 10 STA TN.4 AI/crM load tests to 1600 tons and also four( 4)- 1.600 ton Static load tests. <br /> <br />r'1 <br /> <br />. <br /> <br />r'l <br /> <br />San Pablo Creek Bridl!:e - Jacksonville. FOOT - Responsible Geotechnical Engineer during construction <br />phase of this major bridge crossing Intracoastal Waterway. Perfonned I'DA. CAPW AI' and WEAl' analysis of <br />31 test piles. Provided pile lengths, driving criteria recommendations and problem solving of various <br />construction challenges. Saved $400.000 in foundation cost using test data to ootimize oile lengths. <br /> <br />. <br /> <br />. <br /> <br />.., <br /> <br />Evolved Expendable Launch Vehicle. Cape Canaveral. Florida - Responsible Geotechnical Engineer. Perfonned pDA <br />testing. Wave Equation and Signal Matching oflol1y six (46) closed end pipe piles. Performed 9 STA TNAM/crM load <br />tests up to 400 tons with toe strain instrumentation. Performed foundation recommendations for 500 million dollar <br />structure on behalforNASA and Lockeed Martin. <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />11602 Perpetual Drive 0 Odessa. Florida 335560 Phone: (727) 376-50400 Fax: (727) 376-5018 <br /> <br />..., <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.