My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tally Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
Tally Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 2:27:13 PM
Creation date
8/30/2011 2:26:27 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Svcs including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Molasses Keef Marina Corporation <br /> <br />I 806 N Flamingo Road, Suite )00 <br />F embroke Fines, Florida) )028 <br />954-447-7775 telephone 954-447-2772 tacsimile <br /> <br />To whom it may concern <br />Subject: Reference Letter for Tally Engineering, Inc. <br />Name of Project: Molasses Reef Marina <br />Project Location: 1550 Ocean Drive. Kev Lar~o. Monroe County. Florida <br />Project Description: Project consisted of the construction of 135 slip marina in National Park Preserve <br />directly on the ocean. <br /> <br />Services Provide: Tally Engineering, Inc. was retained for this project to perform inspection and <br />construction management for the construction of this marina, which included the following: (a) drilling <br />the cap rock; (b) installing jetty pilings; (c) construction of the pier caps and beams; (d) place decking; <br />and (e) bringing the water and electric to the slips. Tally Engineering's responsibilities were to inspect <br />the work, perform inspections on all the pile driving, certify the piling logs, inspect al! the rebar for the <br />structural pile caps, monitor, inspect and perform materials testing for all structural concrete, and <br />perform all inspection and certification of al! electrical and plumbing demands; review invoices and <br />recommend to the Owner for payment. <br /> <br />Were Inspection performed timely? <br />Was the Quality of work satisfactory? <br />Was Tally Engineering, Inc. Responsive to the Owner and Contractor? <br />Was Tally Engineering, Inc. timely with reviews and submittals? <br />Did Tally Engineering, Inc. quickly resolve issues as they arose? <br /> <br />.., <br />. <br /> <br />, <br />. <br /> <br />.., <br />. <br /> <br />.., <br />. <br /> <br />., <br /> <br />. <br /> <br />-, <br />. <br /> <br />I <br />. <br /> <br /> <br />-, <br />. <br /> <br />.., <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />..., <br />. <br /> <br />.., <br /> <br />. <br /> <br />~ <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />~ <br /> <br /> <br />. <br /> <br />...., <br /> <br />. <br /> <br />orman Wartman <br />Molasses Reef Marina Corp. <br /> <br />..., <br /> <br />. <br /> <br />July 11, 2011 <br /> <br /> <br />Evaluation Criteria <br /> <br /> <br />No <br />
The URL can be used to link to this page
Your browser does not support the video tag.