My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tally Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
Tally Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 2:27:13 PM
Creation date
8/30/2011 2:26:27 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Svcs including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-, <br /> <br />. <br /> <br />, <br />.' <br /> <br />. . <br />ACI <br /> <br />.. <br />. <br /> <br />Atlantic Civil, Inc. <br /> <br />9350 South Dixie Highway I Suite 1250 I Miami, FL 33156 I 305-670-9610 I Fax: 305-670.6787 <br /> <br />-, <br />. <br /> <br />July 13, 2011 <br /> <br />., <br />. <br /> <br />The City of Sunny Isles Beach <br />Sunny Isles Beach Government Center <br />18070 Collins Avenue <br />Sunny Isles Beach, FI 33160 <br /> <br />., <br />. <br /> <br />., <br /> <br />. <br /> <br />Re: <br /> <br />Tally Engineering, Inc. <br /> <br />..., <br />. <br /> <br />To Whom It May Concern: <br /> <br />.., <br />. <br /> <br />Please accept this document to serve as reference for Tally Engineering for Quality <br />Control Serves rendered to Atlantic Civil, Inc. <br /> <br />-, <br /> <br />Name of Project: Channel 5 Bridge to Toll Gate Blvd. and Fishing Pla({orms <br />Project Location: Monroe County, Florida <br />FDEP Project No. 67826 <br />FDEP Contract # DC842 <br />Project Cost: $2,044,602.00 <br /> <br />. <br /> <br />.., <br />., <br /> <br />r'1 <br /> <br />Scope of work: Project consisted of 1.8 miles of shared use bicycle pathway and the <br />construction of seven cantilevered fishing pier platforms on the existing Overseas Heritage <br />Trail Railway. <br /> <br />. <br /> <br />., <br /> <br />Services Provided: Tally Engineering performed Quality Control Management and was <br />responsible for the following: <br /> <br />(a) Conducting all pre-activity meetings prior to the subcontractor beginning the activity, <br />including review of all submittals and guidelines per the project !ipecifications; <br /> <br />(b) Performing acceptance testing of all materials heing used within the limits of the <br />project: <br /> <br />(c) Monitoring and inspecting field placement of all structural jlll material (embankment, <br />sub-grade and base rock): <br /> <br />(d) Inspections on all reinforced steel, forms and hracingfor the bridge and gravity wall: <br /> <br />(e) Impection of prestress heams and piles at the precast/preslresslacility: <br /> <br />(/) Monitoring the installation ofpiles and oversight of all structural concrete: <br /> <br />(g) Monitoring and testing of Super pave Asphalt Concrete, <br /> <br />-, <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />...., <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />...., <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.