Laserfiche WebLink
<br />.., <br /> <br />-, <br /> <br /> <br />REQUEST fOR QUALlFlCATIOi'lS <br />NO. 11-07-01 <br />Speciallnspcction Scrviccs <br />Including Gcotcchnical / <br />Construction Administration <br /> <br />~ <br />TAl T Y r!\:GTI\'FFRrNG. 11\'(" <br />E.::iDl'crin~.:\tlllk'rial.. Tc,till~ *(;l'111l'('bnitJ,lI.L~h(lnl.t(l~ <br /> <br /> <br />. <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />. Proof of Insurance <br />Our Insurance Certificate is attached as Attachment "A" <br /> <br />., <br />. <br /> <br />., <br /> <br />. Indication of how long it would take to implement service after authorized to begin. <br />After the Notice to Proceed is issued by the City of Sunny Isles, Tally Engineering is prepared to <br />mobilize within 48 hours. <br /> <br />. <br /> <br />..., <br />. <br /> <br />2. <br /> <br />QUALIFICATIONS <br /> <br />Proposer's relevant experience qualifications and past performance <br /> <br />.., <br /> <br />Tally Engineering, Inc., in association with Tierra South Florida, Inc. (Geotechnical Engineers), <br />Applied Foundation Testing, Inc. (Specialty Engineer for Load Testing), C3TS (Environmental <br />Issues and Permitting), New Millennium Engineering, Inc. (Bridge Design and Construction <br />Expertise), collectively referred to as Team Tally, is pleased to submit our response to Request For <br />Qualifications (RFQ), No. 11-07-01, to provide Special Inspection Services, including Geotechnical / <br />Construction Administration for the City of Sunny Isles. <br /> <br />Team Tally is a partnership between these firms that aims to align the goals of the team to those of the <br />City of Sunny Isles. Collaborative and facilitative leadership is the key to accomplishing this objective. <br />Our team has worked together on numerous projects and excellent teamwork already exists among the <br />firms. <br /> <br />Team Tally's strength consists of over 30 CTQP personnel qualified in multiple disciplines, capable of <br />providing the required services especially at the peak of project personnel needs. <br /> <br />Team Tally is fully committed to this project, and shall be available for assignment within 48 hours after <br />notification. Our experience in geotechnical engineering, civil and utility design and coordination <br />services, bridge design and construction, building design and construction, including threshold and <br />special inspection services, construction administration and engineering services, environmental <br />services, material testing and laboratory services has raised our awareness and made us ever so <br />mindful of the following key attributes that are essential to the overall success of these projects: <br /> <br />. Availability of Qualified Personnel <br />. Diversity of Qualified Personnel <br />. Project Management with over 25 years of experience in bridge and building construction and <br />design services <br />. Material and Testing Knowledge & Experience <br />. Quality Control/Quality Assurance Program <br />. Construction Management with extensive private, County, City and FDOT experience <br />. Complete and Accurate Record Keeping <br />. Integrity of Test Results <br />. CMEC Qualified Laboratory <br />. Sensitivity to Laboratory Turnaround Time <br />. Establishing Guidelines for Material Certification Process <br />. Time-Goal Awareness <br />. Effective Communication with contractor and City and County officials <br />. Open Communication with the Project's General Contractor and Sub-Contractors <br />. Exceeding City of Sunny Isles' Expectations and Project Requirements <br />. Qualified Prestress Inspector, Level 1 and Level 2 <br />. CTQP Qualified Inspector, Level 2 for complex bridges <br />. CTQP Qualified Technician for asphalt, concrete, and earthwork <br />. CTQP Qualified Pile Driving Inspector <br />. CTQP Qualified Drill Shaft Inspector <br /> <br />...., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />., <br /> <br />. <br /> <br />.., <br />. <br /> <br />-, <br />. <br /> <br />..., <br /> <br />. <br /> <br />-, <br />. <br /> <br />., <br /> <br />. <br /> <br />. <br /> <br />-, <br /> <br />. <br /> <br />., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />., <br /> <br />. <br /> <br />P'l"~ ') ntl,) <br />