Laserfiche WebLink
<br />, <br />. <br />-, <br />I <br />., <br />. <br />., <br />. <br />, . <br />. <br />..., <br />. <br />-, <br />. <br />..., <br />. <br />-., <br />. <br />.., <br />. <br />., <br />. <br />-, <br />. <br />.., <br />. <br />-. <br />. <br />..., <br />. <br />., <br />. <br />., <br />. <br />..., <br />. <br />., <br />. <br /> <br /> <br />REQUEST FOR QI1ALlFIC\T10:'olS <br />NO. 11-07-01 <br />Spcciallnspectinn Serviccs <br />Including Geotechnical / <br />Construction Administration <br /> <br /> <br />~ <br />TAl J Y FI\'(;TNEERII\'G TNC <br />t:n~iDccrin;.:.:\ll1k.'rials Tl...tin~ *(;l'1lkChniul*Lthurlltllf1 <br /> <br />. Certified Inspector to perform and issue reports for Cross Sonic Logging (CSL) for drill shaft <br />foundation <br /> <br />An explanation of why the Proposer is the best qualified to perform the contract and <br />demonstrate its qualifications including an item-by-item disclosure outlining how the firm <br />meets or exceeds the requirements of the RFP. <br /> <br />Team Tally is very familiar with these two projects (pier and restaurant and bridge) since Tally <br />Engineering, at the request of the City of Sunny Isles, reviewed the projects and provided an <br />estimate to perform a peer review of the projects. This provided a basic understanding of these <br />projects and has allowed Team Tally to put together a team tailored to meet the needs of these <br />projects from design to complex construction, building experience and special inspector services. <br />Team Tally has experience in all aspects of these projects. The team and individuals assembled <br />for these projects cannot be matched. <br /> <br />Team Tally's understanding of these project includes geotechnical and construction management <br />services for the construction of the North Bay Road bridge to connect 172 to 174 Street, the fishing <br />pier and restaurant. <br /> <br />These two projects require experience in the areas of bridge construction and building construction. <br />Tally Engineering is one of the few consultants that, by itself, has all the qualifications for bridge <br />design and inspection, building design and inspection, geotechnical design, inspection and <br />laboratory testing and services. This bridge project has a special qualification, designated in the <br />FDOT guidelines and specifications as complex bridges, and this is met by inclusion in Team Tally <br />of New Millennium Engineering, Inc. Tally Engineering has done numerous design, construction <br />engineering and inspection services for towns and cities statewide, as well as numerous building <br />designs, threshold inspection, and special inspection services. Attached as Attachment "B", is a <br />summary of this work. In order to provide additional expertise and provide the City of Sunny Isles <br />with the exact needs to ensure success in this project, Team Tally has been assembled additional <br />expertise and skills for these projects. <br /> <br />Construction Administration and Proiect Manaqement Services <br /> <br />Team Tally has assigned a Project Manager who has extensive experience in this role in both <br />bridge design and construction and building construction and design, including material testing. <br />This experience well exceeds the requirements identified for this RFQ. <br /> <br />Support Responsibilitv. The Team Tally Project Manager is well-qualified to assist the City Project <br />Manager in all aspects of the construction contract and its administration. The Project Manager has <br />over 30 years of real, hands-on experience in this role and is well versed in the permitting and <br />regulatory requirements for these projects and in reviewing schedules, revisions to schedules, <br />progress payments, requests for change orders, shops, submittals, RFls as well as providing the <br />City Project Manager with all logs, reports, progress meeting minutes and any other tasks and <br />recommendations that the City Project Manager may request. The Team Tally Project Manager's <br />extensive experience also provides the expertise to adapt to any situation that may arise that may <br />impact the project and respond to ensure that all elements of the construction proceed according to <br />the plans and specifications. <br /> <br />Coordination of Contractor's Submittals. Team Tally will provide coordination of the drawings as <br />follows: <br />. Study and review Plans, Specifications, Special Provisions, MUTCD, contract documents, and <br />pertinent manuals prior to beginning the project <br />. Identify all the items that require shop drawings and make the contractor aware of this <br /> <br />Dn~n "1 ~+ 1" <br />