Laserfiche WebLink
<br />, <br /> <br />Attachment <br /> <br />. <br /> <br />Tally Engineering, Inc. <br />LiST OF PROJECT <br /> <br />, <br /> <br />. <br /> <br />1 <br />. <br /> <br />Project: Christitll1 Life Church <br />Client: Christian Life Restoration <br />Center Inc. <br />Date: On-going <br />Scope of Service Provided: <br /> <br />Contact Name: <br /> <br />Dr. Yole He <br />Fabre <br /> <br />Cit)': <br />Phone: <br /> <br />SUllrise <br />954-254-0502 <br /> <br />, <br /> <br />Architectural, Civil, Electrical Mechanical, Pluming and Geotechnical <br />Construction management, threshold and materials testing services. <br />21,000 squrere feet with munlti purpose room and administration office. <br /> <br />Services, <br /> <br />. <br /> <br />.., <br />. <br /> <br />.., <br />. <br /> <br />Project: Abreu Residellce <br />Client: Mr. Abreu <br />Date: On-going <br />Scope of Service Provided: <br /> <br />Contact Name: <br /> <br />0(1': Golt/ell Beach <br />Phone: <br /> <br />..., <br /> <br />Civil Engineering, Electrical, Mechanical, Structural <br />management, threshold and materials testing services. <br />10,400 square feet of a single family home. <br /> <br />Design Services, Construction <br /> <br />. <br /> <br />.., <br />. <br /> <br />Project: 1-595Express Corridor Improvemellt Project 0(1': Ft. Lauderdale <br />Client: HNTB Contact Name: Ken Hill Phone: 321-508-4966 <br />Scope of Service Provided: Prestress 1 Precast Yard Inspection, Dry and wet drainage Yard Inspection. <br />Client: South Underground Utilities Contact Name: Omar McFarlane Phone: 954-583-8745 <br />Date: On-going <br />HNTB Services: Providing all offsite prestress pile, Florida I-Beam, wet and dry drainage percast yard inspection. <br />This services were provided in leu of FOOT Inspection. <br />Southeast Underground Utilities: Provided specialty engineer for drillshaft consisting of Cross Sonic Logging, <br />Engineer Analysis report, and redesign/modification of drillshaft structures. <br />The 1-595 Express Corridor Improvements Project consists of the reconstruction of the 1-595 mainline and all <br />associated improvements to frontage roads and ramps from the 1-75/Sawgrass Expressway interchange to the 1-595/1- <br />95 interchange, for a total length along 1-595 of approximately 10.5 miles, and approximately 2.5 miles on Florida <br />Turnpike from Peters Road to Griffin Road. The design and construction cost of the project is approximately $1.2 <br />billion. The major project components include <br /> <br />, <br />I <br /> <br />-, <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />., <br />. <br /> <br />. <br /> <br />Project: Heritage Park Parkillg Garage <br />Client: City of Sunny Isles <br />Date: Completed 05/20 II <br />Scope of Service Provided: Structural Inspections, Civil Engineering, Geotechnical, Materials testing and <br />laboratory services <br />Five-Story Parking Garage. Scope of inspection was geotechnical, inspection, foundation, structural steel columns and <br />beams, precast members, post tension slabs, masonry inspection, shear wall inspection, waterproofing, roof inspection and <br />all sampling and testing of earthwork, concrete, and laboratory services. <br /> <br />Contact Name: <br /> <br />Jorge Vera <br /> <br />0(1': <br />Phone: <br /> <br />SUIIII)' Isles <br />305-792-1912 <br /> <br />.., <br /> <br />. <br /> <br />.., <br /> <br />.., <br /> <br />. <br /> <br />. <br /> <br />Project: Cfllll111el5 Bridge to Toll Gate Blvd. ami Fishillg Platform <br />Client: Atlantic Civil, Inc. Contact Name: Ted Tabor <br />Date: Completed 12-2010 <br />Scope of Service Provided: Quality control manager, Materials testing and inspection, rebar inspection at Bridge <br />Project consisted of adding a new five foot wide paved bike path and converting 12 sections of existing bridge to a <br />fishing pier. Tally Engineering, Inc. performed Quality Control Management for this project. Tally was responsible <br />for the conducting all pre-activity meetings prior to the contractor beginning the activity, including review of all <br />submittals, of the guidelines per the project specification, and of the contractor sequence and contingency plans; <br />perfonning acceptance testing of all materials being use within the limits of the project; monitoring and inspecting the <br />field placement of all structural fill material (embankment, sub-grade and base rock); performing inspections on all <br />reinforced steel, fonns and bracing for the bridge and gravity wall; inspecting all prestress beams and piles at the <br />precast/prestress yard; and monitoring the installation of driven piles, the placement of all structural concrete and the <br /> <br />0(1': <br />Phone: <br /> <br />Islamor(l{la <br />305-670-9610 <br /> <br />-, <br /> <br />. <br /> <br />.., <br /> <br />.. <br /> <br />.., <br /> <br />.., <br /> <br />. <br />