<br />Project: Tile FOll1ltaills Oil Oceall Boulevard
<br />Client: Dinerstein Companies Contact Name: Jody Prochaska
<br />Date: Completed 011/2009
<br />Scope of Service Provided: Threshold Inspection and materials testing and construction management
<br />Two- Seven Story with two level of Parking Garage in each tower. The foundation consists of auger-cast piles with pile
<br />caps and grade beams. With a reinforced concrete structural Slab on grade. And eight inches reinforced post-tension
<br />slab was used on the entire elevated slab. Structural frame consist of reinforced concrete columns and exterior
<br />reinforced concrete masonry wall. Performed window buck inspection and final window inspection. Roof inspection,
<br />light weight pull test and membrane placement.
<br />
<br />Ci()':
<br />Phone:
<br />
<br />Ft. Lauderdale
<br />832-209-1200
<br />
<br />.
<br />
<br />..,
<br />.
<br />
<br />..,
<br />.
<br />
<br />..,
<br />
<br />Project: Tile Harbor Square
<br />Client: Dinerstein Companies
<br />Date: Completed 10/2009
<br />Scope of Service Provided: Threshold Inspection and materials testing
<br />Two Four Story Tower totaling 740,000 SF and Two stand alone parking garage totaling 200,000 SF (one Three-story
<br />parking garage and the second Four-story parking garage) Parking Garage The two tower foundation is support by
<br />conventional spread footing with isolated column pads, with a reinforced post-tension slab on grade. Structural frame
<br />consist wood system studs, joist and girder and exterior plywood sheeting. Two four story parking garage foundation
<br />were improve by vibro-flotation then conventional spread footing with isolated column pads. A pre-stress joist and
<br />girder system with eight inches reinforced slab was used on the entire elevated slab.
<br />
<br />Contact Name:
<br />
<br />Jody Prochaska
<br />
<br />Ci(I':
<br />Phone:
<br />
<br />Orlal1llo
<br />832-209-1200
<br />
<br />..,
<br />.
<br />
<br />.
<br />
<br />..,
<br />.
<br />
<br />..,
<br />
<br />...,
<br />
<br />Project: Turtle RUll
<br />Client: Vero Beach
<br />Date: Completed 08/2009
<br />Scope of Service Provided: Design of site for single family home development
<br />Design and approve a new site plan to include the following activities for the one hundred and eighty six single
<br />family home community: wet and dry retention ponds, environmental plan, mitigation plans, water, sewer, force-
<br />main, pavement design, signage and marking, lighting, curb and gutter, new access road to the State road Sixty (60) to
<br />include storage lane, median work, landscaping, irrigation, and a new signalization.
<br />
<br />Contact Name:
<br />
<br />Sandy Segall
<br />
<br />Ci()':
<br />Phone:
<br />
<br />Vero Bead,
<br />954-447-7775
<br />
<br />-
<br />
<br />...,
<br />
<br />.
<br />
<br />.
<br />
<br />...,
<br />
<br />...,
<br />
<br />Project: New Acce.u Road (1/ Grand Palms CouIltry Club
<br />Client: Grand Palms Contact Name: Mr. Pat Segall
<br />Date: Completed 03/2009
<br />Scope of Service Provided: Design of new access road for a the Community of 500 homes to access Pembroke
<br />Pines
<br />The intent of this new alignment is to alleviate the traffic from the main entrance of this community through Pines
<br />Blvd. which is a heavily utilized State Road. This project consist of alignment design, design, drainage design, curb
<br />and gutter, lighting, pavement marking, signage, channelization and new signalization at Pembroke Pines.
<br />
<br />Ci(I':
<br />Phone:
<br />
<br />Pembroke Pilles
<br />954-431-8800
<br />
<br />.
<br />
<br />.
<br />
<br />..,
<br />
<br />.
<br />
<br />..,
<br />
<br />-,
<br />
<br />Project: Scllool of [slamic Studies Prayer Hall
<br />Client: School of Islamic Studies Contact Name: Waseem Quadri
<br />Date: Completed 03/2009
<br />Scope of Service Provided: Architectural, Structural,MEP and Management
<br />Tally Engineering, Inc. was hired as a Design Consultant and Construction Manager to provide professional services
<br />to School of Islamic of Broward County. Our involvement consisted of I) pre-construction activities as a planner and
<br />designer, 2) during-construction as construction manager and special inspector, and 3) post-construction to close out
<br />the project. This was a 6.5 million dollar project, extending over 10 acres, and was an elementary school and daycare
<br />facility, in addition to all the civil engineering, landscaping, structural, architectural, mechanical and electrical
<br />services. These services were provided for the owner and Tally acted as owner representative. The scope of services
<br />included: providing Resident Engineer, Inspector, Scheduler and Cost Estimator, Cost Estimating, Claims and Change
<br />Order Analysis. The Resident Engineering and Inspection Services included: ensuring all work is perfonned in
<br />Page 2 of 4
<br />
<br />Ci(I':
<br />Phone:
<br />
<br />SUllrise
<br />786-229-9047
<br />
<br />.
<br />
<br />.
<br />
<br />..,
<br />
<br />.
<br />
<br />...,
<br />
<br />.
<br />
<br />.,
<br />
<br />'.
<br />
|