|
<br />,
<br />.
<br />
<br />..,
<br />.
<br />
<br />Pirooz H. Borojerdi, P.E.
<br />Civil/Structural Engineer
<br />
<br />~
<br />III
<br />
<br />Tally Engineering, Inc.
<br />
<br />.
<br />
<br />. The Harbor Apartment Building, Ft. Lauderdale, FL.
<br />Responsible for Structural Design, threshold Inspection and materials testing services of Six Story with two level of
<br />Parking Garage. The foundation consists of auger-cast piles with pile caps and grade beams. With a reinforced
<br />concrete structural Slab on grade and Eight inches reinforced post-tension slab was used on the entire elevated
<br />slab. Structural frame consist of reinforced concrete columns and exterior reinforced concrete masonry wall.
<br />Performed window buck inspection and final window inspection. Roof inspection, light weight pull test and
<br />membrane placement.
<br />
<br />...,
<br />.
<br />
<br />..,
<br />
<br />..,
<br />.
<br />
<br />. Tabernacle Missionary Baptist Church, Tallahassee, FL
<br />Responsible for Structural Design Threshold Inspection and Construction Management. 25,000 SF Church and
<br />Classrooms, and Administration Building. The foundation consists of auger-cast piles with pile caps and grade
<br />beams. A reinforced concrete structural Slab on grade was used. Structural frame consist of reinforced concrete
<br />masonry bearing wall. Structural steel tube columns with open web bar joist with girders and metal roof deck
<br />
<br />..,
<br />I
<br />
<br />..,
<br />.
<br />
<br />. Hopewell Baptist Church Daycare, Pompano Beach, FL.
<br />Responsible for Structural Design Special Inspection and Construction Management 15,000 SF Daycare Facility
<br />by conventional spread footing with isolated column pads. Reinforce concrete slab on grade. Structural frame
<br />consist of reinforced concrete masonry bearing wall with Structural steel tube columns. Wood roof structure
<br />consists of open web joists, girders and plywood sheeting.
<br />
<br />..,
<br />.
<br />
<br />'l
<br />I
<br />
<br />. Hopewell Baptist Church, Pompano Beach, FL
<br />Responsible for Structural Design and Threshold Inspection. 25,000 SF Church and facilities support by
<br />conventional spread footing with isolated column pads. Reinforce concrete slab on grade. Structural frame consist
<br />of reinforced concrete masonry bearing wall. Structural steel tube columns with open web bar joist with girders
<br />and metal roof deck. One piece metal roof system was completely built on ground and entire system flown into
<br />place on one day.
<br />
<br />..,
<br />.
<br />
<br />-.
<br />
<br />. Meritage Apartment Building, Ft. Lauderdale, FL.
<br />Responsible for Structural Design services of twin five story apartment buildings and parking garage, 134,000 sq.
<br />ft., 50 feet in height, structure: concrete two-way floor slab/concrete columns and beams, pile foundation, two way
<br />slab concrete column and beams and reinforced masonry walls.
<br />
<br />.
<br />
<br />.
<br />
<br />. Van Buran Apartments, Hollywood, FL.
<br />Responsible for Structural Design of 10 story building, 145,000 sq. ft., 96 feet in height, basement parking garage,
<br />retail spaces on ground floor. Structure: permanent and temporary sheet piling, coffer dam, foundation, pile and
<br />cap, post tensioning slabs, concrete columns.
<br />
<br />1""\
<br />
<br />,.,
<br />
<br />.
<br />
<br />.,
<br />.
<br />
<br />. Flamingo Falls Professional Center Phase I, Pembroke Pines, FL.
<br />Responsible for Structural Design Threshold Inspection and Construction Management for 230,000 SF of 4-story
<br />tilt-up Office Building, support by conventional spread footing with isolated column pads. Reinforce concrete slab
<br />on grade. Structural frame consist of reinforced concrete bearing wall (A four story tilt -up wall system. One of
<br />the first four story tilt wall panel in South Florida) Structural steel tube columns with concrete roof deck.
<br />
<br />.,
<br />
<br />. Bergeron Properties, Pembroke Pines, FL
<br />Responsible for Structural Design and Special Inspections. 150,000 SF Office / Warehouse / Industrial Park,
<br />support by conventional spread footing with isolated column pads. Reinforce concrete slab on grade. Structural
<br />frame consist of reinforced concrete bearing wall (Tilt -up wall system.). Structural steel joist and girder with
<br />metal decking roof.
<br />
<br />..,
<br />.
<br />
<br />.
<br />
<br />.
<br />
<br />. Sunshine Bird Seed, Opa Locka, FL
<br />Responsible for Project Structural Design, Threshold Inspection and Construction Management. Warehouse and
<br />Production facility (158 feet tall); Structural Steel, Piling, Pile Foundation, Pile Caps, Silos, Elevators; Conveyor
<br />Belts, Insulated Metal Siding
<br />
<br />..,
<br />
<br />,
<br />.
<br />
<br />. Heritage Park Parking Garage, Sunny Isles, FI.
<br />Responsible for Threshold Inspection services, assuring that the work is done in conformance with the design
<br />intent of the official contract documents per ~553.79(7), F.S. and the Threshold Plan for a Five Story Parking
<br />Garage. The scope of work includes pilings, pile caps, grade beams, structural slab, columns and beams, post tension
<br />
<br />..,
<br />
<br />.
<br />
<br />Page30f5
<br />
|