Laserfiche WebLink
<br />, <br />. <br /> <br />.., <br />. <br /> <br />Pirooz H. Borojerdi, P.E. <br />Civil/Structural Engineer <br /> <br />~ <br />III <br /> <br />Tally Engineering, Inc. <br /> <br />. <br /> <br />. The Harbor Apartment Building, Ft. Lauderdale, FL. <br />Responsible for Structural Design, threshold Inspection and materials testing services of Six Story with two level of <br />Parking Garage. The foundation consists of auger-cast piles with pile caps and grade beams. With a reinforced <br />concrete structural Slab on grade and Eight inches reinforced post-tension slab was used on the entire elevated <br />slab. Structural frame consist of reinforced concrete columns and exterior reinforced concrete masonry wall. <br />Performed window buck inspection and final window inspection. Roof inspection, light weight pull test and <br />membrane placement. <br /> <br />..., <br />. <br /> <br />.., <br /> <br />.., <br />. <br /> <br />. Tabernacle Missionary Baptist Church, Tallahassee, FL <br />Responsible for Structural Design Threshold Inspection and Construction Management. 25,000 SF Church and <br />Classrooms, and Administration Building. The foundation consists of auger-cast piles with pile caps and grade <br />beams. A reinforced concrete structural Slab on grade was used. Structural frame consist of reinforced concrete <br />masonry bearing wall. Structural steel tube columns with open web bar joist with girders and metal roof deck <br /> <br />.., <br />I <br /> <br />.., <br />. <br /> <br />. Hopewell Baptist Church Daycare, Pompano Beach, FL. <br />Responsible for Structural Design Special Inspection and Construction Management 15,000 SF Daycare Facility <br />by conventional spread footing with isolated column pads. Reinforce concrete slab on grade. Structural frame <br />consist of reinforced concrete masonry bearing wall with Structural steel tube columns. Wood roof structure <br />consists of open web joists, girders and plywood sheeting. <br /> <br />.., <br />. <br /> <br />'l <br />I <br /> <br />. Hopewell Baptist Church, Pompano Beach, FL <br />Responsible for Structural Design and Threshold Inspection. 25,000 SF Church and facilities support by <br />conventional spread footing with isolated column pads. Reinforce concrete slab on grade. Structural frame consist <br />of reinforced concrete masonry bearing wall. Structural steel tube columns with open web bar joist with girders <br />and metal roof deck. One piece metal roof system was completely built on ground and entire system flown into <br />place on one day. <br /> <br />.., <br />. <br /> <br />-. <br /> <br />. Meritage Apartment Building, Ft. Lauderdale, FL. <br />Responsible for Structural Design services of twin five story apartment buildings and parking garage, 134,000 sq. <br />ft., 50 feet in height, structure: concrete two-way floor slab/concrete columns and beams, pile foundation, two way <br />slab concrete column and beams and reinforced masonry walls. <br /> <br />. <br /> <br />. <br /> <br />. Van Buran Apartments, Hollywood, FL. <br />Responsible for Structural Design of 10 story building, 145,000 sq. ft., 96 feet in height, basement parking garage, <br />retail spaces on ground floor. Structure: permanent and temporary sheet piling, coffer dam, foundation, pile and <br />cap, post tensioning slabs, concrete columns. <br /> <br />1""\ <br /> <br />,., <br /> <br />. <br /> <br />., <br />. <br /> <br />. Flamingo Falls Professional Center Phase I, Pembroke Pines, FL. <br />Responsible for Structural Design Threshold Inspection and Construction Management for 230,000 SF of 4-story <br />tilt-up Office Building, support by conventional spread footing with isolated column pads. Reinforce concrete slab <br />on grade. Structural frame consist of reinforced concrete bearing wall (A four story tilt -up wall system. One of <br />the first four story tilt wall panel in South Florida) Structural steel tube columns with concrete roof deck. <br /> <br />., <br /> <br />. Bergeron Properties, Pembroke Pines, FL <br />Responsible for Structural Design and Special Inspections. 150,000 SF Office / Warehouse / Industrial Park, <br />support by conventional spread footing with isolated column pads. Reinforce concrete slab on grade. Structural <br />frame consist of reinforced concrete bearing wall (Tilt -up wall system.). Structural steel joist and girder with <br />metal decking roof. <br /> <br />.., <br />. <br /> <br />. <br /> <br />. <br /> <br />. Sunshine Bird Seed, Opa Locka, FL <br />Responsible for Project Structural Design, Threshold Inspection and Construction Management. Warehouse and <br />Production facility (158 feet tall); Structural Steel, Piling, Pile Foundation, Pile Caps, Silos, Elevators; Conveyor <br />Belts, Insulated Metal Siding <br /> <br />.., <br /> <br />, <br />. <br /> <br />. Heritage Park Parking Garage, Sunny Isles, FI. <br />Responsible for Threshold Inspection services, assuring that the work is done in conformance with the design <br />intent of the official contract documents per ~553.79(7), F.S. and the Threshold Plan for a Five Story Parking <br />Garage. The scope of work includes pilings, pile caps, grade beams, structural slab, columns and beams, post tension <br /> <br />.., <br /> <br />. <br /> <br />Page30f5 <br />