Laserfiche WebLink
<br />.., <br />. <br /> <br />-, <br />. <br /> <br />., <br />. <br /> <br />" <br />. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />., <br />. <br /> <br />.., <br />. <br /> <br />I <br /> <br />r"1 <br />. <br /> <br />,., <br />. <br /> <br />..., <br /> <br />. <br /> <br />., <br />. <br /> <br />.., <br />. <br /> <br />., <br />. <br /> <br />.., <br /> <br />. <br /> <br />r-, <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />Freddy Arminaiia <br />Project Administrator / Laboratory / Materials Testing / Construction Management <br /> <br />Hopewell Baptist Day Care, <br />Pompano Beach, FL <br />Contact: Reverend Robert Stanley 954-675-5449 Completed 2008 <br />As a Threshold Inspector agent, for Tally Engineering, Inc. I was responsible for structural inspections and materials testing <br />and laboratol)' services of a 15,000 square feet Daycare Facility this project I was responsible to perfonn inspection in the <br />areas such as by spread footing with isolated column pads. Reinforce concrete slab on grade. Structural framing, reinforced <br />concrete masonl)' bearing wall, with structural steel tube columns, wood roof structure, and plywood sheeting. Metal <br />roofing including under lament, building code inspection and all sampling and testing of earthwork, concrete, and laboratol)' <br />servIces. <br /> <br />School of Islamic Studies, <br />Sunrise FL <br />Contact: Dr.Querishi or Waseem Quadri 786-229-9047 Completed 2008 <br />As a Threshold Inspector agent, for Tally Engineering, Inc. I was responsible for structural inspections and materials testing <br />and laboratol)' services of a 19,000 square feet Elemental)' School and Daycare I was responsible for Inspection and <br />certification. Foundation, slab on grade, structural column, beams, structural roof members, bracing, wall sheetings, metal <br />roof system, door and window installation, interior framing, and all structural inspection for the interior build out of this <br />facility. <br /> <br />1-75 & Pines Blvd <br />Project #: 415152-2-58-01 <br />Contractor: Bergeron Land Development <br />Ted Hojara (954) 680-6100 <br />Project Description: The project consisted of modifying the existing interstate overpass entrance and exit ramps from a rural <br />configuration to an urban configuration as well as drainage, widening, and signalization along Pembroke Pines Boulevard. <br />Responsible: Quality control management of all material begins use within the limit of the project. Monitor and inspected <br />the field placement of all structural fill material (embankment, pipe-backfill, sub-grade and base rock). Monitor the <br />placement of all structural concrete including drilled shaft, (for Mass Anns and Cantilever Signs). Monitor the excavation <br />and concrete placement for all for Mass Anns and Cantilever Signs drilled shaft structural. Monitor the milling and paving <br />operation for all milling of existing asphalt pavement and new Superpave Asphalt Concrete placement. <br /> <br />CR931 (Sombrero Beach Rd) from Avenida <br />Primceria to Sombrero Blvd <br />FI N #: 410648-1-52-01 <br />Contractor: Atlantic Civil, Inc. <br />Dan Pickel (305) 206-6904 <br />Project consisted of three miles milling and resurfacing of Sombrero Boulevard between US I to A venida Primceria and <br />miscellaneous roadway improvements consisting such as widening along Sombrero Boulevard, drainage, sidewalks, and <br />added a new five feet wide paved bike path. Responsible: Quality control management of all material begins use within the <br />limit of the project. Monitor and inspected the field placement of all structural fill material (embankment, pipe-backfill, <br />sub-grade and base rock). Monitor the placement of all structural concrete. Monitor the milling and paving operation for all <br />milling of existing asphalt pavement and new Superpave Asphalt Concrete placement. <br /> <br />Channel 5 Bridge to Toll Gate Blvd. and Fishing Platform <br />Contractor: Atlantic Civil, Inc. <br />Ted Tebar (305) 670-9610 <br />Quality control manager, Materials testing and inspection, rebar inspection at Bridge Project consisted of adding a new five <br />foot wide paved bike path and converting 12 sections of existing bridge to a fishing pier. Tally Engineering, Inc. perfonned <br />Quality Control Management for this project. Tally was responsible for the conducting all pre-activity meetings prior to the <br />contractor beginning the activity, including review of all submittals, of the guidelines per the project specification, and of <br />the contractor sequence and contingency plans; performing acceptance testing of all materials being use within the limits of <br />the project; monitoring and inspecting the field placement of all structural fill material (embankment, sub-grade and base <br />rock); perfonning inspections on all reinforced steel, fonns and bracing for the bridge and gravity wall; inspecting all <br />prestress beams and piles at the precast/prestress yard; and monitoring the installation of driven piles, the placement of all <br />structural concrete and the placement of the bike path's Superpave Asphalt Concrete. <br /> <br />n <br /> <br />Tully ElIgirlu()rlf1iJ.1'lc <br />