<br />..,
<br />.
<br />
<br />-,
<br />.
<br />
<br />.,
<br />.
<br />
<br />"
<br />.
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />.,
<br />.
<br />
<br />..,
<br />.
<br />
<br />I
<br />
<br />r"1
<br />.
<br />
<br />,.,
<br />.
<br />
<br />...,
<br />
<br />.
<br />
<br />.,
<br />.
<br />
<br />..,
<br />.
<br />
<br />.,
<br />.
<br />
<br />..,
<br />
<br />.
<br />
<br />r-,
<br />
<br />.
<br />
<br />..,
<br />
<br />.
<br />
<br />Freddy Arminaiia
<br />Project Administrator / Laboratory / Materials Testing / Construction Management
<br />
<br />Hopewell Baptist Day Care,
<br />Pompano Beach, FL
<br />Contact: Reverend Robert Stanley 954-675-5449 Completed 2008
<br />As a Threshold Inspector agent, for Tally Engineering, Inc. I was responsible for structural inspections and materials testing
<br />and laboratol)' services of a 15,000 square feet Daycare Facility this project I was responsible to perfonn inspection in the
<br />areas such as by spread footing with isolated column pads. Reinforce concrete slab on grade. Structural framing, reinforced
<br />concrete masonl)' bearing wall, with structural steel tube columns, wood roof structure, and plywood sheeting. Metal
<br />roofing including under lament, building code inspection and all sampling and testing of earthwork, concrete, and laboratol)'
<br />servIces.
<br />
<br />School of Islamic Studies,
<br />Sunrise FL
<br />Contact: Dr.Querishi or Waseem Quadri 786-229-9047 Completed 2008
<br />As a Threshold Inspector agent, for Tally Engineering, Inc. I was responsible for structural inspections and materials testing
<br />and laboratol)' services of a 19,000 square feet Elemental)' School and Daycare I was responsible for Inspection and
<br />certification. Foundation, slab on grade, structural column, beams, structural roof members, bracing, wall sheetings, metal
<br />roof system, door and window installation, interior framing, and all structural inspection for the interior build out of this
<br />facility.
<br />
<br />1-75 & Pines Blvd
<br />Project #: 415152-2-58-01
<br />Contractor: Bergeron Land Development
<br />Ted Hojara (954) 680-6100
<br />Project Description: The project consisted of modifying the existing interstate overpass entrance and exit ramps from a rural
<br />configuration to an urban configuration as well as drainage, widening, and signalization along Pembroke Pines Boulevard.
<br />Responsible: Quality control management of all material begins use within the limit of the project. Monitor and inspected
<br />the field placement of all structural fill material (embankment, pipe-backfill, sub-grade and base rock). Monitor the
<br />placement of all structural concrete including drilled shaft, (for Mass Anns and Cantilever Signs). Monitor the excavation
<br />and concrete placement for all for Mass Anns and Cantilever Signs drilled shaft structural. Monitor the milling and paving
<br />operation for all milling of existing asphalt pavement and new Superpave Asphalt Concrete placement.
<br />
<br />CR931 (Sombrero Beach Rd) from Avenida
<br />Primceria to Sombrero Blvd
<br />FI N #: 410648-1-52-01
<br />Contractor: Atlantic Civil, Inc.
<br />Dan Pickel (305) 206-6904
<br />Project consisted of three miles milling and resurfacing of Sombrero Boulevard between US I to A venida Primceria and
<br />miscellaneous roadway improvements consisting such as widening along Sombrero Boulevard, drainage, sidewalks, and
<br />added a new five feet wide paved bike path. Responsible: Quality control management of all material begins use within the
<br />limit of the project. Monitor and inspected the field placement of all structural fill material (embankment, pipe-backfill,
<br />sub-grade and base rock). Monitor the placement of all structural concrete. Monitor the milling and paving operation for all
<br />milling of existing asphalt pavement and new Superpave Asphalt Concrete placement.
<br />
<br />Channel 5 Bridge to Toll Gate Blvd. and Fishing Platform
<br />Contractor: Atlantic Civil, Inc.
<br />Ted Tebar (305) 670-9610
<br />Quality control manager, Materials testing and inspection, rebar inspection at Bridge Project consisted of adding a new five
<br />foot wide paved bike path and converting 12 sections of existing bridge to a fishing pier. Tally Engineering, Inc. perfonned
<br />Quality Control Management for this project. Tally was responsible for the conducting all pre-activity meetings prior to the
<br />contractor beginning the activity, including review of all submittals, of the guidelines per the project specification, and of
<br />the contractor sequence and contingency plans; performing acceptance testing of all materials being use within the limits of
<br />the project; monitoring and inspecting the field placement of all structural fill material (embankment, sub-grade and base
<br />rock); perfonning inspections on all reinforced steel, fonns and bracing for the bridge and gravity wall; inspecting all
<br />prestress beams and piles at the precast/prestress yard; and monitoring the installation of driven piles, the placement of all
<br />structural concrete and the placement of the bike path's Superpave Asphalt Concrete.
<br />