Laserfiche WebLink
<br />, <br />. <br /> <br />Lawrence Johnson <br /> <br />, <br />. Senior Technician (Earthwork, Concrete, Paving Inspector) <br /> <br />, <br />. <br /> <br />KEY PROJECTS: <br /> <br />, <br />I <br /> <br />New Interchange at SR710 <br />Project #: 232074-2-52-01 <br />Contractor: Bergeron Land Development <br />Glause Brasil (954) 680-6100 <br />Project Description: Project consisted of adding a new Sunpass only exit <br />interchange north bound and south bound with an extension of 1.5 miles off of <br />Jog Road to State Road 710 in Riviera Beach Florida. Project include of 2 MSE <br />walls, one bridge spanning over the turnpike, 2,000 feet of 8 feet tall cast in place <br />sound wall and drainage improvement. <br />Services Provide Monitor and inspected the field placement of all structural fill <br />material including sampling and material testing of embankment, pipe-backfill, <br />sub-grade and base rock. Monitor sample and test the placement of all structural <br />concrete including drilled shaft, (for Mass Arms and Cantilever Signs). Monitor <br />the milling and paving operation for all milling of existing asphalt pavement and <br />new Superpave Asphalt Concrete placement including monitoring spread rate, <br />cross slope, and straightedge. <br /> <br />..., <br /> <br />. <br /> <br />,., <br />. <br /> <br />.., <br />. <br /> <br />., <br />. <br /> <br />SRA1A (SE 1th Street) <br />Project #: 415267-1-52-01 <br />Contractor: Williams Paving Company, Inc. <br />Elliot Eichel (305) 882-1950 <br />Project Description: Project consists of widening 1200 feet of existing roadway, <br />along of 1 y1h street and adding 900 feet of cast in place retaining wall ranging <br />from three to six feet in height with a galvanized tube railing. <br />Services Provide: Monitor and inspected the field placement of all structural fill <br />material including sampling and material testing of embankment, pipe-backfill, <br />sub-grade and base rock. Monitor sample and test the placement of all structural <br />concrete including drilled shaft, (for Mass Arms and Cantilever Signs). Monitor <br />the milling and paving operation for all milling of existing asphalt pavement and <br />new Superpave Asphalt Concrete placement including monitoring spread rate, <br />cross slope, and straightedge. <br /> <br />,., <br />. <br /> <br />,., <br />. <br /> <br />,.., <br />. <br /> <br />..., <br />. <br /> <br />SR93 (1-75) & Sheridan Street Interchange <br />Project #: 411321-3-52-01 <br />Contractor: Weekley Asphalt Paving, Inc. <br />Ronnie King (954) 680-8005 <br />Project Description: The project consisted of widening and extending the existing <br />interstate overpasses entrance and exit ramps. Including reconfiguration and <br />modifying existing drainage, and signalization along, Sheridan Street. Add 1000 <br />feet of new sidewalk and 300 feet of a new fenced in pedestrian walk way. Add <br />four miles of guardrail along 1-75 between Miramar to Griffin exit. In milling and <br />resurfacing of Sheridan Street between, Dike Road to SW 142th avenue. <br />Services Provide: Monitor and inspected the field placement of all structural fill <br />material including sampling and material testing of embankment, pipe-backfill, <br />sub-grade and base rock. Monitor sample and test the placement of all structural <br />concrete including drilled shaft, (for Mass Arms and Cantilever Signs). Monitor <br />the milling and paving operation for all milling of existing asphalt pavement and <br />new Superpave Asphalt Concrete placement including monitoring spread rate, <br />cross slope, and straightedge. <br /> <br />,., <br /> <br />I <br />. <br /> <br />,., <br />. <br /> <br />r"1 <br />. <br /> <br />., <br />. <br /> <br />., <br />. <br /> <br />., <br /> <br />. <br /> <br />Experience Highlights <br /> <br />More than 7 years of <br />construction and materials <br />testing. <br /> <br />Corporate Office: <br />Pembroke Pines, Florida. <br /> <br />Education: <br />Collins High School - Diploma <br /> <br />Bachelor of Science- Alcorn <br />State University <br /> <br />Certifications: <br /> <br />~-'-Q~ <br /> <br />Aggregate Field Testing <br />Technician <br />Aggregate Lab Testing <br />Technician <br />Aggregate Testing Technician <br />LBR Technician <br />Qualified Sampler Technician <br />Asphalt Paving Technician <br />Level I & II <br />Concrete Field Technician <br />Levell <br />Concrete Lab Technician Levell <br />Earthwork Construction <br />Inspection Levell & II <br />Final Estimate Level I <br /> <br />~l. ~<-""Il'l1ob'l\II. <br />~... -""----- <br /> <br />Concrete Field Technician <br />Grade 1 <br /> <br />J.\ TROXL~I" <br />........... ,u.......,............ ,'~ .-"""" <br /> <br />Nuclear Gauge Safety Training <br />Certification <br />Nuclear Safety Radiation Officer <br /> <br />S <br /> <br />FDOT Maintenance & <br />Protection of Traffic <br /> <br />it <br /> <br />., <br />. <br /> <br />Tally EngllleenrlQ,I1c <br />