My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tally Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
Tally Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 2:27:13 PM
Creation date
8/30/2011 2:26:27 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Svcs including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />., <br />I <br /> <br />., <br /> <br />. <br /> <br />-, <br />. <br /> <br />., <br />. <br /> <br />., <br />. <br />. <br /> <br />,., <br />I <br /> <br />,..., <br />I <br />. <br /> <br />,.., <br />I <br /> <br />,., <br />. <br /> <br />,.., <br />. <br /> <br />..., <br />. <br /> <br />r"1 <br />. <br /> <br />" <br /> <br />. <br /> <br />..., <br />. <br /> <br />..., <br /> <br />. <br /> <br />" <br /> <br />. <br /> <br />., <br />. <br /> <br />., <br />Ii <br /> <br />,.., <br /> <br />. <br /> <br />Patrick Hewell <br />Project Laboratory Manager/Project Coordinator <br /> <br />New Interchange at SR710 <br />Project #: 232074-2-52-01 <br />Contractor: Bergeron Land Development <br />Glause Brasil (954) 680-6100 <br />Project Description: Project consisted of adding a new Sunpass only exit interchange north bound and south <br />bound with an extension of 1.5 miles off of Jog Road to State Road 710 in Riviera Beach Florida. Project include <br />of 2 MSE walls, one bridge spanning over the turnpike, 2,000 feet of 8 feet tall cast in place sound wall and <br />drainage improvement. <br />Services Provide: Quality control management of all material begin use within the limit of the project. Monitor <br />and inspected the field placement of all structural fill material (embankment, pipe-backfill, sub-grade, base rock <br />and MSE retaining wall system). Monitor the placement of all structural concrete including drilled shaft, (for <br />Mass Arms and Cantilever Signs). Also prepare and monitor all Mass Concrete placements for bridge footings, <br />columns and pier caps. Monitor the excavation and concrete placement for all for Mass Arms and Cantilever <br />Signs drilled shaft structural <br /> <br />Design & Construction of Ramp Westbound Eller Drive <br />To US1 and Widening Southbound US1 Bridge over 1-595 <br />Project #: 236806-3-52-01 <br />Contractor: PCL Constructors, Inc. <br />Danielle Murphy (954)923-6299 <br />Project Description This project included the design and construction of a ramp and bridge from westbound Eller <br />Drive to US-1 southbound, in addition to the widening of US-1 southbound bridge over 1-595. The project <br />included roadway improvements consisting for drainage, lighting, signing, striping, mechanically stabilized earth <br />(MSE) retaining wall system. <br />Services Provide: Quality control management of all material begin use within the limit of the project. Monitor <br />and inspected the field placement of all structural fill material (embankment, pipe-backfill, sub-grade, base rock <br />and MSE retaining wall system). Monitor the placement of all structural concrete including drilled shaft, (for <br />Mass Arms and Cantilever Signs). Monitor the excavation and concrete placement for all for Mass Arms and <br />Cantilever Signs drilled shaft structural. <br /> <br />tt <br /> <br />Tally Enginei'lIng, 11C <br />
The URL can be used to link to this page
Your browser does not support the video tag.