My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tally Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
Tally Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 2:27:13 PM
Creation date
8/30/2011 2:26:27 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Svcs including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br /> <br />. <br /> <br />Troy Woznick <br /> <br />Senior Technician (Earthwork and Concrete Inspector) <br /> <br />Mr. Woznick began his construction background at PLH Contracting, Inc. from <br />1998 to 2003 as a Department Supervisor for structural concrete design repairs <br />and restoration. His responsibilities included design interpretation, supervising the <br />construction process, Materials Specifications and pay quantities for his <br />department. Mr. Woznick began employment with Tally Engineering in February <br />2004 as a Transportation Construction Engineering Inspector. His responsibilities <br />comprise of the overall quality and inspections of roadway construction and <br />materials used in conjunction with FDOT Project Specifications. These Inspection <br />roles consist of Earthwork Operations; Concrete Placement; Traffic Signalization <br />and Maintenance of Traffic Compliance. Mr. Woznick has been a significant <br />attribute to Tally Engineering, showing his motivation and determination to serve <br />the Industry as a quality Inspector. <br /> <br />., <br />. <br /> <br />., <br />. <br /> <br />..., <br />. <br /> <br />., <br />. <br /> <br />-, <br />. <br /> <br />KEY PROJECTS: <br /> <br />.., <br /> <br />Golden Glades Tandem Truck Staging <br />Project #: 414223-1-72-01 <br />Contractor: Williams Paving Company <br />Elliot Eichel (305) 882-1950 <br />Project Description: Project consisted of widening and adding drainage to east <br />bound SR836 off ramp. Add a new turning lane from SR 441 to east bound to SR <br />826 east bound. Mill and resurface eastbound ramp from SR 441 to SR 826 just <br />before bridge. Also milled and resurfaces access tandem truck staging parking <br />lot. Services Provide: Monitor and inspected the field placement of all structural <br />fill material including sampling and material testing of embankment, pipe-backfill, <br />sub-grade and base rock. Monitor sample and test the placement of all structural <br />concrete including drilled shaft, (for Mass Arms and Cantilever Signs). <br /> <br />. <br /> <br />.., <br />. <br /> <br />.., <br /> <br />. <br /> <br />., <br />. <br /> <br />Design & Construction of Ramp Westbound Eller Drive <br />To US1 and Widening Southbound US1 Bridge over 1-595 <br />Project #: 236806-3-52-01 <br />Contractor: PCL Constructors, Inc. <br />Danielle Murphy (954)923-6299 <br />Project Description This project included the design and construction of a ramp <br />and bridge from westbound Eller Drive to US-1 southbound, in addition to the <br />widening of US-1 southbound bridge over 1-595. The project included roadway <br />improvements consisting for drainage, lighting, signing, striping, mechanically <br />stabilized earth (MSE) retaining wall system. Services Provide: Monitor and <br />inspected the field placement of all structural fill material including sampling and <br />material testing of embankment, pipe-backfill, sub-grade and base rock. Monitor <br />sample and test the placement of all structural concrete including drilled shaft, (for <br />Mass Arms and Cantilever Signs). <br /> <br />,., <br />. <br /> <br />--, <br /> <br />. <br /> <br />,., <br />. <br /> <br />..., <br /> <br />. <br /> <br />r"1 <br /> <br />SR824 (Pembroke Road) <br />Project #: 411439-1-52-01 <br />Contractor: General Asphalt Company, Inc. <br />Albert Lopez (305) 592-3480 <br />Project Description: Project consisted of three miles milling and of roadway and <br />miscellaneous roadway improvements consisting such as widening along west <br />and east bound of Pembroke Road, drainage, sidewalks, and signalization. <br />Services Provide: Monitor and inspected the field placement of all structural fill <br />material including sampling and material testing of embankment, pipe-backfill, <br />sub-grade and base rock. Monitor sample and test the placement of all structural <br />concrete including drilled shaft, (for Mass Arms and Cantilever Signs). Arms and <br />Cantilever Signs drilled shaft structural. <br /> <br />. <br /> <br />., <br /> <br />I <br /> <br />,.., <br /> <br />. <br /> <br />r"1 <br /> <br />. <br /> <br />Experienc'e Highlights <br /> <br />More than 11 years of <br />construction and materials <br />testing. <br /> <br />Corporate Office: <br />Pembroke Pines, Florida. <br /> <br />Education: <br />Hudson High School - Diploma <br /> <br />Pasco Hernando Community <br />College - Associates Degree <br /> <br />Certifications: <br /> <br />~~r9~ <br />Concrete Field Technician <br />Earthwork Technician <br />Level I & II <br />Final Estimates I <br /> <br />J"!!1II!- -..-..-c-.....~. <br />~1 _.....--"'_ <br /> <br />Concrete Field Testing <br />Technician <br /> <br />J.\ TROXLER' <br />,. t.... . -:: ....._:1"""1<<-.. Jt. ,-.. <br /> <br />Nuclear Gauge Safety Training <br />Certification <br /> <br />S <br /> <br />FOOT Maintenance & <br />Protection of Traffic Course <br /> <br />6) <br /> <br />IMSA Signalization Inspector <br /> <br />it <br /> <br />.... <br /> <br />Tally cnglneering,l'lc <br />
The URL can be used to link to this page
Your browser does not support the video tag.