Laserfiche WebLink
<br />.., <br />. <br /> <br />., <br /> <br />Jeyson Arroyave <br />Senior Technician (Earthwork and Concrete Inspector) <br />KEY PROJECTS: <br /> <br />. <br /> <br />..., <br /> <br />SR9 (1-95) Palm Beach Lakes Blvd to Blue Heron Blvd. <br />Project #: 231920-1-52-01 <br />Contractor: Archer Western <br />Brain J. Sparks (904) 739-7600 <br />FDOT Contact: Charles Simpkis 954-677-7100 <br />Project Description, The project consisted of five miles of widening and <br />constructing of six new lanes extending the existing interstate 195 to a ten lane <br />highway. Reconstruction consists of removing and reconstructing 3 bridges, 6- <br />Mechanically stabilized earth (MSE) retaining wall system, approximately two <br />miles of cast in place retaining wall, and signalization. <br />Responsibility: Monitor and inspected the field placement of all structural fill <br />material including sampling and material testing of embankment, pipe-backfill, <br />sub-grade, MSE retaining wall system and base rock. Monitor sample and test <br />the placement of all structural concrete including drilled shaft, (for Mass Arms and <br />Cantilever Signs). <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />-, <br />. <br /> <br />,., <br />. <br /> <br />,.., <br />. <br /> <br />-, <br />. <br /> <br />SR824 (Pembroke Road) <br />Project #: 411439-1-52-01 <br />Contractor: General Asphalt Company, Inc. <br />Albert Lopez (305) 592-3480 <br />FDOT Contact: Charles Simpkis 954-677-7100 <br />Project Description: Project consisted of three miles milling and of roadway and <br />miscellaneous roadway improvements consisting such as widening along west <br />and east bound of Pembroke Road, drainage, sidewalks, and signalization. <br />Responsibility: Monitor and inspected the field placement of all structural fill <br />material including sampling and material testing of embankment, pipe-backfill, <br />sub-grade, and base rock. Monitor sample and test the placement of all structural <br />concrete including drilled shaft, (for Mass Arms and Cantilever Signs). <br /> <br />., <br />. <br /> <br />""1' <br /> <br />. <br /> <br />,.., <br />. <br /> <br />Design & Construction of Ramp Westbound Eller Drive <br />To US1 and Widening Southbound US1 Bridge over 1-595 <br />Project #: 236806-3-52-01 <br />Contractor: PCL Constructors, Inc. <br />Danielle Murphy (954)923-6299 <br />FDOT Contact: Charles Simpkis 954-677-7100 <br />Project Description This project included the design and construction of a ramp <br />and bridge from westbound Eller Drive to US-1 southbound, in addition to the <br />widening of US-1 southbound bridge over 1-595. The project included roadway <br />improvements consisting for drainage, lighting, signing, striping, (MSE) retaining <br />wall system. Responsibility: Monitor and inspected the field placement of all <br />structural fill material including sampling and material testing of embankment, <br />pipe-backfill, sub-grade, MSE retaining wall system and base rock. Monitor <br />sample and test the placement of all structural concrete including drilled shaft, <br />(for Mass Arms and Cantilever Signs). <br /> <br />,.., <br /> <br />. <br /> <br />..., <br />. <br /> <br />.., <br /> <br />. <br /> <br />.., <br />. <br /> <br />..., <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />.., <br />I I <br /> <br />Experience Highlights <br /> <br />More than 4 years of <br />construction and materials <br />testing. <br /> <br />Corporate Office: <br />Pembroke Pines, Florida. <br /> <br />Certifications: <br /> <br />c~r9P <br />Concrete Field Technician <br />Levell <br />Earthwork Construction <br />Inspection Levell & II <br /> <br />~. '--iUn<-'Irt.~". <br />~I ,1Iot_..._...."......... <br /> <br />Concrete Field Testing <br />Technician <br /> <br />i\ TRaJL~R' <br />'...\_'" ,c,-. ' ",,- .........t. ..-. <br />Nuclear Gauge Safety Training <br />Certification <br /> <br />-IT <br /> <br />T~!hr ~nfllnc.~f1P" 11c <br />