My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 3:03:09 PM
Creation date
8/30/2011 3:02:44 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Svc
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />(t <br /><t <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />() <br />. <br /><I <br />. <br />. <br />. <br />() <br />() <br /><l <br />o <br />. <br />. <br />. <br />r"\ <br /> <br />I ~.^ \.1 Calvin. Giordano f, Associates. Inc. <br />~iEX([rllONAL SOLllTIONS <br /> <br />I <br /> <br />NORTH BAY ROAD BRIDGE SURVEY <br />Sunny Isles Beach, Florida <br /> <br /> <br />CGA performed Design and Route Surveys for new bridge connecting 2 portions of the City. As part of this <br />project CGA established horizontal and vertical control points along with establishing a baseline that will <br />be used for design and construction of the bridge, CGA also calculated new easement areas based on our <br />control survey, prepared sketch and descriptions to be used in acquiring right-of-way for the proposed <br />bridge and then staked the easements on the ground for inspection by City officials and adjacent land <br />owners. Recently CGA has prepared a sketch and description of a portion of an existing Conservation <br />Easement that will be vacated as part of the bridge construction. <br /> <br />11-4344_ North Bay RD Bridge <br /> <br />Client <br />City of Sunny Isles Beach <br /> <br />Contact information <br />at time of project: <br /> <br />Jorge Vera <br />Assistant City Manager <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, FL <br />33160 <br />(305) 792-1912 <br /> <br />Project Date <br />2003 - Present <br /> <br />Services Provided <br /> <br />Design Survey <br />Route Survey <br />Construction Control <br />Survey <br />Sketch and Descriptions <br /> <br />Principal-an-Charge <br />Dennis J. Giordano <br /> <br />Project Manager <br />Robert Jackson, PSM <br /> <br />Project Team <br /> <br />Greg Clements, PSM <br />Don Cooper, PSM <br />Lisa Kuhar <br />Gloria Clavijo <br />Jim Frederick <br />Survey crews <br /> <br />Page 219 <br />
The URL can be used to link to this page
Your browser does not support the video tag.