Laserfiche WebLink
<br />3 <br />3 <br />~ <br />:l <br />. <br />~ <br />"l <br />~ <br />. <br />. <br />~ <br /> <br />'" <br />.... <br />:t <br />:) <br />. <br />:) <br />o <br />~ <br />~ <br />:'} <br />. <br />:l <br />:t <br />. <br />~ <br />~ <br />. <br />. <br />. <br />') <br />f) <br />() <br />') <br />"l <br />') <br />') <br />-. <br />) <br />") <br />) <br />., <br />'1 <br />,. <br /> <br />Dhuruva (Drew) Badri, PE <br />Project Geotechnical Engineer/Project Manager <br />Professional Service Industries, Inc. <br />Page 2 of 2 <br /> <br />. SR 869 Deerfield Toll Plaza Modifications Design-Build, Broward County, Florida. Project <br />Geotechnical Engineer. The $39.2 million project is part of an ambitious construction program to convert <br />the Sawgrass Expressway into an open road tolling facility. PSI provided geotechnical engineering <br />services during the conversion of the Deerfield toll plaza, located between the Lyons Road and Turnpike <br />interchanges, into a high-tech plaza - no gates, tollbooths nor need to slowdown for drivers with <br />SunPass, <br /> <br />. 1-95 Managed Lanes Design-Build, Miami-Dade County, Florida. Project Geotechnical Engineer, The <br />1-95 Express Lanes Project in Miami-Dade County was designed to create "Express" toll lanes (two in <br />each direction) along 1-95 by converting the existing High Occupancy Vehicle (HOV) lanes, At a cost of <br />$122 Million; the project includes the portion of 1-95 between SR 112 (also known 1-195 and the Airport <br />Expressway) and the Golden Glades Interchange. <br /> <br />. W18th Avenue (from W 60th Street to N. of W 64th Street), Hialeah, Florida. Project Geotechnical <br />Engineer. PSI conducted a roadway soil survey to provide geotechnical roadway recommendation for the <br />pavement reconstruction and drainage improvements of W. 18th Avenue from W. 60th Street to north of <br />W. 64th Street in Hialeah, Florida. Our services included performing field reconnaissance, utility clearance, <br />subsurface exploration, percolation tests, laboratory testing, measuring groundwater depths, providing <br />engineering evaluations and recommendations. <br /> <br />. W 11th Avenue (from 23rd Street to 26th Street), Hialeah, Florida. Project Geotechnical Engineer. The <br />project involves the reconstruction of approximately 4,177 linear feet of roadway. PSI conducted a <br />Roadway Soil Survey with the purpose to obtain information concerning the general subsurface conditions <br />along the roadway alignments to make engineering estimates and recommendations regarding soil <br />stratigraphy at the boring locations, assessment of the existing soil subgrade and groundwater conditions <br />along the roadway alignments for subgrade suitability and pavement support, general location and <br />description of existing fills, soils and potentially deleterious materials encountered in the borings that may <br />affect reconstruction activities and pavement performance, site preparation requirements and engineering <br />criteria for placement and compaction of in-situ soils and approved fill materials, identification of critical <br />design and/or construction considerations based on the soil and groundwater conditions encountered in <br />the borings, and groundwater level measurements in the borings, <br /> <br />. S.R. 15 in Palm Beach County, Florida. Project Geotechnical Engineer. PSI performed a Roadway <br />Distress Evaluation along State Road 15, from E. 5th Street to SR700 in Pahokee, FL under our district <br />wide contract with the Florida Department of Transportation. The subject roadway consists of an <br />approximate 4 mile segment of two lanes (one in each direction), The conducted field exploration, <br />laboratory testing and engineering evaluation allowed for a formal explanation of the distress cause and to <br />provide the different alternatives for the roadway rehabilitation. <br /> <br />. MDX S.R. 924 (From Station 102+00 to 130+00) Miami, Florida. Project Manager/ Project Geotechnical <br />Engineer. The overall project consists of milling and resurfacing, overbuilding and roadway reconstruction <br />along S.R. 924 in Miami-Dade County, Florida. PSI conducted a roadway soil survey specifically to a <br />2,800 linear foot section of roadway reconstruction between stations 102+00 and 130+00, <br /> <br />. 1-95 Roadway Widening, S.R. 60 to C.R. 52 (10 miles), Indian River County, Florida. Project <br />Geotechnical Engineer. Bridge Widening and Drainage Study. <br /> <br />~.J <br />J~ <br />Page 3\ 23 <br />