My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 3:03:09 PM
Creation date
8/30/2011 3:02:44 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Svc
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />() <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />- <br /> <br />r~5.~ ,f Calvin. Giordano & Associates. Inc. <br /> <br />'=;~ .. E X C E r , I 0 ,", A ISO L 1I , ION S <br />.J :l- <br />I <br /> <br />Indication of How Long It Would Take to Implement Service After Authorized <br />to Begin: <br /> <br />Part of the unique qualifications CGA brings to the table is a depth of knowledge having been connected <br />with both the Newport Fishing Pier and North Bay Road Bridge over the past year managing the permitting <br />efforts. In the case of the Pier, our successful efforts have resulted in approvals through FDEP, USACE and <br />DERM with the final permits expected soon. Our connection has also led to the retention of a qualified <br />marine contractor to execute the work. Upon NTP the full efforts of CGA and the assigned personnel will <br />commence immediately with the administration, management and oversight of the project as well as the <br />steps necessary to get the required sub-consultants under contract. <br /> <br />Work in connection with the Bridge will also continue seamlessly. Having been involved with the <br />permitting efforts for the past six months, CGA is well up to speed on the Project's status. The CGA PM will <br />continue the collaborations with the permitting sub-consultant and simultaneously work with the CGA <br />Prime Consultant to organize the required design team efforts and get the required sub-consultants under <br />contract. <br /> <br />Our estimation is that CGA will begin to implement service immediately after authorized to begin. <br /> <br />RFQ #11-07-01, Special Inspection Services, Including Geotechnical/Construction Administration <br /> <br />Page II 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.