My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 3:03:09 PM
Creation date
8/30/2011 3:02:44 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Svc
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'" <br />., <br />, <br /> <br />-... <br />., <br />..... <br />lP <br />-... <br />.. <br />""" <br />.. <br />.... <br />~. <br />" <br />, <br />~ <br />.... <br />-... <br />..... <br />--. <br />"",p <br />- <br />..... <br />....... <br />.11' <br /> <br />.... <br />') <br />'J <br />') <br />.... <br />~ <br />:'l <br />'l <br />~) <br />'} <br />... <br />:l <br />'l <br />"l <br />-. <br />~) <br />") <br />"l <br />,. <br />') <br />') <br />") <br />t} <br />o <br />f) <br />() <br />') <br />:) <br />~l <br />a <br /> <br />- <br /> <br />I ~\/ Calvin. Giordano & Associates. Inc. <br />~lExcErT'oNAL SOLllTIONS <br /> <br />I <br /> <br />SECTION 2 - QUALIFICATIONS <br /> <br />The CGA team approach centers on a 'gold standard' of attention to detail. Our onsite presence will be <br />highly visible, responsive and dynamic. We will examine the project issues and negative impacts on the <br />residents and will act to minimize them immediately. We have conducted these services in similar <br />contexts; accomplishing improvements within a specific framework, using thorough knowledge and <br />application of processes, order and fluidity, all the while being attentive to the needs of the client and <br />residents. <br /> <br />CGA as a firm has a vast experience in completing projects on-time and under budget as a Construction <br />Management and Prime Consultant. In addition to this, each individual listed in the organizational chart <br />brings a different history of completed projects from every position and side of the Construction Industry. <br />Our team includes former municipal employees, contractors, project managers and construction <br />estimators. This vast experience from every angle of the project allows CGA to circumvent and interpret <br />issues throughout the duration of the project. More specifically, below are reasons why CGA is best <br />qualified for these particular projects. <br /> <br />CGA has been involved in the Newport Fishing Pier project for the past year and is uniquely qualified to <br />provide the coordination, management and inspection services required by the RFQ. Over the past year the <br />firm has become intimately knowledgeable of the components of the varied phases of the work including: <br />permitting, plan review and construction administration as well as coordination of design team, sub <br />consultants and the Contractor. Specifically: <br /> <br />. CGA provided surveying services in connection with the original Pier Park development in 2003. <br /> <br />. CGA was retained in July 2010 to manage the permitting of the Pier and Restaurant. CGA <br />coordinated the permitting and design consultants as well as the state and federal agencies and to <br />date obtained: <br /> <br />o FDEP Notice of Completion <br />o FWC final permit conditions <br />o USACE Biological Opinion allowing land based construction during turtle nesting season <br />o NMFS review and Biological Opinion <br />o DERM "Draft" Class I Permit (Final pending FDEP permit) <br /> <br />. CGA obtained FDEP and DERM permits to allow Pier & Restaurant Demolition and the installation <br />of land based test piles <br /> <br />. CGA coordinated on behalf of the City the Subconsultants and Contractor to complete the <br />Restaurant demolition and test pile installation <br /> <br />. CGA Civil Engineering has initiated the investigation of the existing utility services and met with <br />DERM, WASD and CNMB in connection with same. <br /> <br />CGA has also been involved in the North Bay Road Bridge project for the past six months and is singularly <br />qualified to provide the coordination, management and inspection services required by the RFQ. Over the <br />past six months the firm has become intimately knowledgeable of the components of the varied phases of <br />the work including: permitting and plan review. <br /> <br />RFQ #11-07-01, Special Inspection Services, Including Geotechnical/Construction Administration <br /> <br />Page 211 <br />
The URL can be used to link to this page
Your browser does not support the video tag.