My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wingerter Laboratories Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
Wingerter Laboratories Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 3:18:48 PM
Creation date
8/30/2011 3:18:20 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Svcs
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />t <br /> <br />TAB 4: <br /> <br />QUALITY ASSURANCE <br /> <br />WLI's strategy for performing integrated services within an existing building department is quite simple. We <br />become a vital part of that department by maintaining constant and direct communication with the <br />Department staff that is either influencing or being influenced by our services. The reason we call it simple is <br />because it is based on plain old common sense. If everyone involved with a project is aware of what is <br />happening; things lUn smoother. <br /> <br />Project Management System and Reporting: <br /> <br />WLI's project approach for this contract will be to faithfully execute the following tasks: <br /> <br /> 1. <br />t 2. <br /> 3. <br /> 4. <br /> 5. <br /> 6. <br /> 7. <br /> 8. <br /> 9. <br /> <br />Open and maintain paths of communication between the Department and WLI in order to <br />fully understand and exceed the expectations of the Department. <br />Verify CUlTent testing, inspection, plan review, and permitting procedures and preferences of <br />the internal staff of the Department. <br />Confirm expected delivery deadlines. <br />Communicate constantly with the Department in order to obtain the workload as soon as <br />available. <br />Perform the required services in an efficient and accurate manner. <br />Provide on-going feedback to the permit holders, contractors, engineers, and architects as to <br />the status and possible issues associated with their project. <br />Provide all required documentation to the Department for record keeping and delivelY to the <br />permit holder. <br />Provide accurate accounting of time spent on projects as it relates to billings. <br />Constantly confirm with the Depmtment staff that WLI is meeting or exceeding expectations. <br /> <br />Yes, we do realize that # 1 and #9 are essentially the same task, but we believe that it is so critical to the <br />proper flow and mutual satisfaction of this project that communication be stressed between WLI and the <br />Depmtment. <br /> <br />Given our long history of commitment to client satisfaction and our years of experience providing Special <br />Inspection Services, including GeoteclmicallConstlUction Administration, WLI is confident that we will meet the <br />needs of the City. We do not anticipate any constraints in providing a high level of services to the Depmtment <br />and meeting the assigned time constraints for a given project. We accommodate our client's schedules and <br />specific requirements and have established many long-standing relationships with many diversified clients, <br />including municipalities and private developers who come back repeatedly to WLI for the top level of <br />engineeling services that they have come to know and rely on. <br /> <br />) <br /> <br />) <br /> <br /> <br />WINGERTER <br />LABORATORIES INC. <br /> <br />Professional Engineering & Testing <br />
The URL can be used to link to this page
Your browser does not support the video tag.