Laserfiche WebLink
<br />August 30, 2011 <br />Page 10 of 11 <br /> <br />and durations presented on the Project Schedule dated November 3, 2010 (attached) provided <br />by the Contractor. If the construction duration runs beyond the durations shown in the <br />Construction Schedule, CGA may seek restitution via the potential liquidated damages <br />collected from the Contractor for exceeding their Contractual Schedule. Re-inspections <br />required due to failed inspections and/or faulty materials will be back-charged and held from <br />the Contractors next payment application. CGA shall be required to provide written notification <br />in a timely fashion when delays in the Project or changes in the Project cause the scope and/or <br />cost of this Agreement to change. <br />The Contractor must provide marine transportation from the shore to the water based <br />construction staging area. The Contractor shall also provide Code compliant & OSHA <br />compliant personnel hoisting and access to structure elements as necessary for Special <br />Inspector, Materials Testing and CPR field observations. <br /> <br />3. SUBMITTED <br /> <br />/ U----- <br /> <br />CALVrN, GIORDANO & ASSOCIATES, INe. <br /> <br />Submitted by: <br /> <br />Date: <br /> <br />r~ <br /> <br />4. APPROVAL <br /> <br />Approved by: <br /> <br />Date: <br /> <br />Alan Cohen, City Manager <br />