My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2011-1782
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2011
>
Reso 2011-1782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2013 2:23:34 PM
Creation date
9/22/2011 3:16:55 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2011-1782
Date (mm/dd/yyyy)
09/20/2011
Description
Awd RFQ 11-07-01/agmt w/Calvin Giordano for Special Inspection
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />August 30, 2011 <br />Page 9 of 11 <br /> <br />5. Requests for Information/Contract Document Clarification <br />(RFl's/CDC's): When RFI's and CDC's involve design issue interpretations, <br />the CPR shall coordinate with the PROJECT MANAGER as needed, to <br />resolve the CONTRACTOR's Requests for Information, Contract Document <br />Clarifications, Field Orders, and other related correspondence. <br /> <br />6. Substantial Completion/Punch List: When the CONTRACTOR considers <br />that the Work has reached Substantial Completion, the CONTRACTOR shall <br />notify the CPR who shall verify that the work has progressed to the <br />substantial completion point in accordance the Contract Documents. If the <br />CPR is in agreement, the CPR shall contact the PROJECT MANAGER to <br />agree on a schedule for conducting a substantial completion "walk-through" <br />inspection of the Work. CPR shall attend and participate in the substantial <br />completion "walk-through", perform a substantial completion inspection with <br />the CONTRACTOR, AlE CONSULTANT and the CITY, and prepare a <br />punch list that describes items remaining to be completed. <br /> <br />7. Final Completion and Project Closeout: When the CONTRACTOR <br />considers that the Work has reached Final Completion, the CONTRACTOR <br />shall notify the CPR who shall verify that the work has progressed to the <br />Final Completion point in accordance the Contract Documents. If the CPR is <br />in agreement, the CPR shall contact the PROJECT MANAGER to agree on a <br />schedule for conducting a Final Completion "walk-through" inspection of the <br />Work. CPR shall attend and participate in the Final Completion "walk- <br />through" and perform a Final Completion inspection with the <br />CONTRACTOR, AlE CONSULTANT and the CITY. If the work is <br />determined to be incomplete, CPR and other attendees shall each develop a <br />punch list of items requiring completion or correction prior to consideration <br />of final acceptance of each project which shall be forwarded to the <br />CONTRACTOR by the CPR for each project. The CPR shall work with the <br />AlE CONSULTANT and the CONTRACTOR to ascertain materials required <br />for the closeout binder, as required by the CITY, and review the Operation <br />and Maintenance manuals for each project for completeness prior to <br />forwarding documentation to the CITY. <br /> <br />8. Compliance: Upon final completion, project closeout and acceptance, the <br />CPR shall provide a letter of compliance (Exhibit "A") to the City of Sunny <br />Isles Beach. <br /> <br />2. BASIS OF COMPENSATION <br /> <br />Lump sum fee of $415,655.00 plus reimbursables of $18,877.50 with a total not to exceed <br />amount of $434,532.50. Payments to be made monthly. This proposal is based on Prime <br />Consulting services and Project Management Services to address pre-construction permitting <br />and coordination and post-construction project closeout services and CPR for an estimated <br />construction duration based on the durations specified in the Project Schedule dated November <br />3,2010 (attached) provided by the Contractor. The Subconsultants fees are based on the tasks <br />
The URL can be used to link to this page
Your browser does not support the video tag.