My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2655
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2655
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2017 9:36:47 AM
Creation date
2/2/2017 11:36:40 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2655
Date (mm/dd/yyyy)
01/19/2017
Description
CO Nos. 2 & 3 w/Southern Underground Industries for 172 St. Drainage Imp.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O � <br />it OF SUN A <br />CITY OF <br />SUNNY ISLES BEACH <br />AMENDMENT NUMBER: #3 <br />U NUM M: it)- U'+--Ul <br />RESOLUTION NUMBER: 2016-2555 <br />Egg <br />DATE: 01/10/2017 <br />PROJECT: Sunny Isles Beach -172nd - <br />Street Drainage Improvements <br />ORIGINAL BASE CONTRACT AMOUNT: <br />1 463 30b.25 _ <br />ORIGINAL CONTINGENCY ALLOWANCE; <br />1130,931.25 <br />ORIGINAL TOTAL CONTRACT AMOUNT; <br />1,063,306.25 <br />NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE <br />ORDERS CONTINGENCY DRAWS; <br />$ 64,847.45 <br />—...--._D.OLLAR.AMOUNT-OF THIS_CHANGE ORDER .CONTINGENCY._DRAW;.. <br />.-101- <br />-01 <br />BUDGET IRCI A <br />BU' ' <br />i{7b 000.40 <br />NEW DOLLAR CONTINGENCY AMOUNT: <br />12b 296.96 <br />NEW DOLLAR CONTRACT AMOUNT: <br />$ 1,163 306.25 <br />ORIGINAL CONTRACT COMPLETION DATE <br />Ol/30�17 <br />TOTAL OF PREVIOUS CHANGE ORDER DAYS; <br />0 <br />AMOUNT OF DAYS PER THIS CHANGE ORDER: <br />60 <br />- <br />NEW CONTRACT COMPLETION DATE: <br />03/31/17 <br />DESCRIPTION OF SCOPE OR WORK CHANGES: _ <br />This change order shall serve is intended to increase the overall project budget by $100,000.00. The nature of the project is <br />such that additional materials and repairs may be needed once the damaged pipe segments are exposed, in order to ensure <br />optimal quality and address all the of points of failure in the existing pipe, more liners and point repairs were required than <br />were,evident.in the initial pre-bid investigation conducted by the City. Additional funding is also required for compliance with. . <br />the SIBPD requirements for off duty support. <br />NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an <br />extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the <br />contract time adjustment and sum agreed to in this document constitute a full and complete settlement of the matters set <br />forth herein, including all direct and indirect costs for equipment, manpower, materials, overhead, profit and delay <br />rnl�tinn +n tko i-.- enh Fn.+h in Chic rirsntmont. <br />CONTRACTOR: <br />Southern Underground <br />Industries <br />-� <br />CITY ATTORNEY: <br />PROJECT MANAGER: <br />Hans Ottinot <br />Elka Linton <br />CITY MANAGER: <br />Christopher J. Russo <br />
The URL can be used to link to this page
Your browser does not support the video tag.