Laserfiche WebLink
<br />Section 3 <br />Scope of Services I Technical Specifications <br /> <br />3.1 SCOPE OF SERVICES <br /> <br />The City of Sunny Isles Beach, Florida, (the "City") a municipality located in Miami-Dade County, <br />Florida, requests qualified Proposers ("Proposers") to submit proposals for the design, permitting, <br />fabrication, and installation of canopy structures to be located at the following parks over the <br />existing non-covered playground areas: <br /> <br />1. Heritage Park Stage 19200 Collins Avenue (see attachment) <br />2. Golden Shores Park 191 Terr. and Atlantic Blvd. (see attachment) <br /> <br />NOTE: Failure by the Proposer to incorporate sufficient information in the conceptual drawings, plans, <br />documentation, and drawing notes does not preclude the Proposer from being responsible for providing a <br />100% complete project acceptable to the City of Sunny Isles Beach. <br /> <br />Given some of the complexities and differences between the two projects, the proposals shall be <br />divided into two projects as each park shall be approved conceptually, designed, permitted, and <br />scheduled separate from each other. This shall ensure that regardless of one, the other can be <br />completed without being dependent on the other. Two crews may be necessary to ensure that the <br />less complex project is completed ahead of the more complex project. <br /> <br />Proposer shall provide all labor, material, equipment, coordination, supervision, designs, and any <br />other service/task that would enable the proposer to provide a 100% approved turn-key project <br />related to the design, fabrication, and installation of an acceptable canopy structure at the Heritage <br />Park playground and the Golden Shores Park playground. <br /> <br />In addition to other items listed within this RFP, the services requested from the Proposer for each <br />playground canopy shall include, but shall not be limited to, the following sections: <br /> <br />3.2 COORDINATION <br /> <br />Coordination with other vendors, sub-consultants, sub-contractors, suppliers, material men, City <br />staff, maintenance personnel, and others to ensure that the project is completed in a satisfactory <br />manner acceptable to the City. <br /> <br />3.3 CONCEPTUAL DRAWINGS/RENDERINGS <br /> <br />Preparation of complete conceptual drawings/renderings. One for each park location. These <br />rendering shall be discussed with City staff. Any modifications requested by the City shall be <br />incorporated into a new rendering at the cost of the proposer. A written approval for the <br />conceptual drawing for either park is required prior to the commencement of the design process. <br /> <br />o i\t the tlllJ~_oLpLQP.c>.S..aJ' proposer MUST submit a sketch or simple rendering of what is <br />proposed. A listing of all the beneficial elements related to the proposal must be clearly <br />defined for consideration. Failure to provide sufficient data, information, descriptions, <br />and/or material may result in proposal rejection. Once an agreement has been executed <br />with the successful proposer, such rendering, submitted at the time of the Proposal, shall <br />be modified and revised as necessary to reflect the desires of the City. Such <br />modifications shall be provided by the Proposer at no extra cost to the City. <br /> <br />3.4 SURVEYS <br /> <br />PAGE 18 OF 33 <br />BID No. 11-10-01 <br />