<br />The City requires that the Proposer prepare surveys for the two sites necessary to obtain permits. <br />Surveys shall be inclusive of underground lines verified in the field by the proposer. No <br />adjustment in costs shall be provided to the proposer in the event of conflicts with underground <br />lines not verified in advance and/or overlooked. <br /> <br />3.5 CONSTRUCTION SCHEDULE <br /> <br />Preparation of a construction schedule for each park location. The construction schedule shall be <br />provided in calendar days (NOT WORK DAYS). Schedule shall include but shall not be limited to <br />the time for conceptual drawing approval, time for a 3 phase design development (30%- <br />50%(dry-run)-90%), permit process with ALL agencies having jurisdiction, prefabrication, <br />installation, finalization, and closeout. <br /> <br />3.6 SCHEDULE OF VALUES <br /> <br />A complete schedule of values must be provided at the time an notice to proceed (NTP) is issued. <br /> <br />3.7 DRAWINGS <br /> <br />Preparation of 100% design and calculation for a complete assembly that is acceptable to the <br />City and permissible by all agencies having jurisdiction. Design must be in full compliance with <br />all pertinent Florida Building Codes, federal, state, and municipal regulations, as well as municipal <br />ordinances that are applicable for the intended construction type. <br /> <br />3.8 PERMITS <br /> <br />Proposer is responsible for applying for and obtaining all permits and paying for all permit fees <br />(excluding City of Sunny Isles Beach fees). Any documentation necessary to obtain permits as <br />required by the agencies having jurisdiction shall be obtained at the sole cost of the Proposer. <br />The City of Sunny Isles Beach does not provide any documentation for permitting. <br /> <br />3.9 DESIGN CONSIDERATIONS and PHASED SUBMISSION: <br /> <br />Design/Plans must include sufficient notations as required by the City to ensure a complete <br />design. The intent of such notations shall be considered by the Proposer and all work, time, <br />material, and labor necessary to accommodate such notations shall be included by the Proposer <br />in the proposal at the time of submission. Unless specifically stated, these notations apply to <br />both playground areas. The notations and/or the intent of the notations should cover the <br />following areas: <br /> <br />. Depiction of extent of demolition and removal of structures must be provided for. <br />. Depiction of limits of staging area and notes to secure other areas adjacent to <br />the project area. <br />. Provisions for protecting areas to remain and repairing damaged areas <br />immediately. <br />. The playground area has "safety buffers" that must remain free and clear of any <br />permanent features such as poles, columns, others. These safety buffers are to <br />allow safe usage of the playground equipment. The safety buffers are provided <br />by Rep Services for each piece of playground equipment installed. Proposer <br />must coordinate safety buffer with the final layout of the columns that will hold <br />the shades. Columns MUST be placed outside of any safety zone. <br /> <br />PAGE 19 OF 33 <br />BID No. 11-10-01 <br />