Laserfiche WebLink
<br />. All metal structures shall be designed to ensure longevity and low maintenance. Material <br />shall be shop fabricated and with electrostatic paint applied. No field welds will be <br />allowed unless authorized in writing by the City. <br />. All connectors and washers shall be stainless steel. <br />. A full site assessment for underground utilities shall be provided by the Proposer to <br />ensure that when excavation occurs and footing pours are conducted that all elements <br />related to underground lines have been resolved, relocated, and revised as necessary <br />and at the cost of the Proposer. The required time shall be included in the construction <br />schedule as a task to be performed and concluded prior to commencement of design. <br />. Overall height of the canopy shall be such that it allows for easy access for removal and <br />placement. <br />. It is requested that consideration be given to a "sail" type system with a canvass which is <br />NOT water-proof but with at minimum a 10-year warranty, which is mold and mildew <br />resistant. <br />. The entire assembly shall be WARRANTED for 1 year by the Proposer including repairs to <br />assemblies, connectors, welds, canvass, canvass cable system, play surface installed, and <br />any other assembly as required and intended under this RFP. <br />. Include a construction fence around the entire playground area during excavation and <br />assembly. The construction fence shall have necessary dust control and shall be <br />inspected every day to ensure that it remains in an adequate condition. <br />. All material associated with the assembly must be suited for the ocean-side environment <br />of the City. All support fabrication must be shop primed and powder-coated or better. <br />No fabrication will be allowed in the field. Shop Drawings and submittals must be <br />provided and approved by the City prior to fabrication. <br /> <br />3.11 Golden Shores Park <br /> <br />Considerations for design should include, but shall not be limited to the following: <br /> <br />. Canvas and assembly shall be similar in color and size to the adjacent canopy structure. <br />. Support structure must be located in such a way that there is no impact to the rubber <br />safety surface provide by Vitriturf Inc. through Rep Services. <br />. Brick pavers, limerock base and subbase, must be replaced as required and grass must <br />be replaced level, with no gaps and in such a way that will allow it to grow properly. <br /> <br />3.12 DESIGN PHASES <br /> <br />. Phase 1 - conceptual phase. A more comprehensive rendering (POST SUBMISSION) of <br />what is proposed is required prior to formalization of a design. The City representative <br />shall approve the rendering. Proposer shall reply to all comments and make adjustments <br />to the design as necessary to accommodate the City's requests at no extra charge. <br />. Phase 2 - 30% and 50% drawings - the 30% drawing submittal shall be submitted to <br />the City to ensure compliance with all comments. Approval of 50% drawings is <br />necessary at which time a dry-run review shall be requested by the Proposer. <br />. Phase 3 - 90% drawings - 90% drawings will be submitted by the proposer as a dry <br />run review to the City for final City comments prior to submitting to permitting agencies. <br /> <br />3.13 FIELD VERIFICATION <br /> <br />Proposer must perform all necessary field verifications to ensure that all aspects of existing <br />elements are CLEARLY understood. Proposer must design the canopy based on field information. <br />Attached to the RFP is a copy of some site layouts and structure information for both parks; <br />however, it is the responsibility of the vendor to understand the field conditions (both surface <br /> <br />PAGE 21 OF 33 <br />BID No. 11-10-01 <br />