My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2644
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2644
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2017 10:33:46 AM
Creation date
2/6/2017 10:42:55 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2644
Date (mm/dd/yyyy)
12/15/2016
Description
Agmt w/O'Leary Richards Design Assoc. for Landscape Architect Srvs.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sunny Isles Beach RFQ No. 16-06-02 <br />Landscape Architect Services <br />Palmetto Bay Municipal Center <br />Village of Palmetto Bay, Florida <br />Client name: Village of Palmetto Bay <br />Description of the scope of work: The net- zero <br />Palmetto Bay Municipal Center is the first LEED Plati- <br />num municipal building in Florida. The 2 story 24,000 <br />sf center sits on 3.3 acres and houses the police sta- <br />tion, building dept., offices and council chambers. <br />Practicing fundamental principles of urban design and <br />public space planning, ORDA strived to create a walka- <br />ble urban environment for the Village's new civic cen- <br />ter. The Bismark palm court acts as the main connector <br />between the parking facilities to the East and the Palm <br />plaza, the project's formal entrance plaza featuring <br />works from the Village's collection of Art in Public Plac- <br />es program. The Palm plaza features a bold and vivid <br />geometric palm leaf motif enclosed by a collection of <br />stately Canary Island Date Palms which frame the plaza <br />and building entrances. The sustainable landscape in- <br />cludes native and indigenous drought tolerant plant <br />material and the irrigation system is fed from a cistern <br />that collects water from the permeable paving system. <br />Total Cost of project: $3,000,000 <br />Project Team: Kathy O'Leary Richards, ASLA, Bill <br />O'Leary, FASLA, Carlos Somoza <br />Role of firm and responsibilities: ORDA provided <br />landscape architectural services which included concep- <br />tual design through construction documentation and <br />assistance in LEED certification. <br />Section 3. Minimum Requirements <br />2.4.3 <br />OTEARY RICHARDS DESIGN ASSOCIATES, INC. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.