My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2644
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2644
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2017 10:33:46 AM
Creation date
2/6/2017 10:42:55 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2644
Date (mm/dd/yyyy)
12/15/2016
Description
Agmt w/O'Leary Richards Design Assoc. for Landscape Architect Srvs.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. NAME 13. ROLE IN THIS CONTRACT <br />Carlos E. Somoza, RLA (State of Maryland) I Project Landscape Architect <br />O'Leary Richards Design Associates, Inc. Miami, Florida <br />Bachelor of Landscape Architecture <br />University of Florida 1997 <br />18. OTHER <br />19 <br />Maryland Landscape Architect #3313 <br />19.;RELEVANT PROJECTS <br />14. YEARS EXPERIENCE <br />STANDARD FORM 330 (0004) PAGE 2 <br />O'LEARY RICHARDS DESIGN ASSOCIATES, INC. 32 <br />(1)TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Palmetto Bay Municipal Center <br />PROFESSIONAL SERVICESCONSTRUCTION <br />(if applicable) <br />Village of Palmetto Bay, Florida <br />2010 <br />2010-2011 <br />(3) BRIEF DESCRIPTION (Brief scope, ske,cost ,etc.) ANDSPECIFICROLE Checkifprojectperformed with current Arm <br />a <br />Project designer responsible for developing the conceptual framework and program elements for the 3.3 acre Village of Palmetto <br />Bay Village Center's public realm areas. Developed plans and details for the formal palm court, fountain plaza and sculhue garden <br />areas. Prepared design development and construction documents for site improvements including the permeable paving system for <br />plaza and parking areas, fountains, signage and planters. (Landscape & hardscape construction costs approximately $550,000) <br />(1)TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />North and South Park <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfepplicable) <br />Town of Golden Beach, Florida <br />2010 <br />2010 <br />(3) BRIEF DESCRIPTION (Briafscope, she, cost etc.) AND SPECIFIC ROLE VChack if project performed with current firm <br />b' <br />Project designer responsible for developing conceptual master plans and construction documents for Golden Beach's two 2 acre <br />community parks. Prepared design development and construction documents for public amenities including multi -use lawn spaces, <br />pedestrian promenades, garden architecture, planting plans, landscape lighting, irrigation design and site furnishings. Played an <br />active role in public meetings with client, town resdents and project stakeholders. (Landscape & hardscape construction costs <br />approximately $600,000) <br />(1)TITLEAND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Downtown Master Plan & Main Street Renovations <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfapplicabk) <br />Winter Haven, Florida <br />2000-2002 <br />2002 <br />(3)BRIEF DESCRIPTION (Briefscope, see, cost, etc.) AND SPECIFIC ROLE Check ifproject performed with current firm <br />C. <br />Developed urban design master plan for 1.2 -square city blocks of historic downtown Winter Haven, Florida including <br />recommendations for greenways, civic parks and streetscape improvements. Project Manager responsible for coordinating <br />conceptual through final construction documents for city -center parks and main street streetscape improvements including pedestrian <br />amenities, streetscape fiunishings, planting plans and planting details. (Landscape construction costs approximately $2.9 million) <br />(1)TITLEAND LOCATION (Crtyand State) <br />(2) YEAR COMPLETED <br />Chicago Botanic Garden Science Center Bridge <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (liapplicabe) <br />Chicago, IL <br />2008 <br />2010 <br />d' <br />(3)BRIEFDESCRIPTION (Briefscope,sce,cost, etc) AND SPECIFIC ROLE Check it project performed with current Arm <br />Led multidisciplinary team through the construction documentation of a 300 linear foot span pedestrian bridge and the renovations <br />for a half -acre evaluation garden. Coordinated the construction drawings and specifications for site amenities including bridge <br />architecture, custom railing design, pedestrian walkways, stone pier and wall systems, landscape lighting, planting plans and <br />irrigation design. (Landscape, hardscape and bridge construction costs approximately $3.5 million) <br />(1) TITLE AND LOCATION (Cify and State) <br />(2) YEAR COMPLETED <br />The Strand Streetscape & Entrance <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfapplicable) <br />Golden Beach, Florida <br />2013 <br />2014 <br />(3) BRIEF DESCRIPTION (Briefscope, see, cost, etc) AND SPECIFIC ROLE Check if project performed with current firm <br />e' <br />Deveoped Master Plan for the Strand Streetscape & Entrance and coordinated final construction documents. <br />STANDARD FORM 330 (0004) PAGE 2 <br />O'LEARY RICHARDS DESIGN ASSOCIATES, INC. 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.