Laserfiche WebLink
E. <br />Kevin N. Richards I Construction Manager <br />14. YEARS EXPERIENCE <br />22 1 14 <br />15. FIRM NAME AND LOCATION (City and State) <br />O'Leary Richards Design Associates, Inc. Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 1 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Bachelor of Construction Management <br />Florida International University, 1993 <br />OTHER PROFESSIONAL QUALIFICATIONS (Publications, Olganaafions, Training, Awards, etc.) <br />Completed training in Autocad and Microstation, Habitat for Humanity Jimmy Carter Work Project, Miami, FL <br />Florida Real Estate License <br />'18. RELEVANT PROJECTS <br />STANDARD FORM 330 (612004) PAGE 2 <br />O'LEARY RICHARDS DESIGN ASSOCIATES, INC. 33 <br />(I)TITLE AND LOCAT ION (City and State) <br />(2) YEAR COMPLETED <br />Miami Dade County Public School Modular Building Program <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfapplicabb) <br />Miami Dade County, Florida <br />2005-2008 <br />2007-2010 <br />(3) BRIEF DESCRIPTION (Bliefsoope, s¢e, cost eta) AND SPECIFIC ROLE V1Check if project performed with current firm <br />a. <br />Responsibilities included the documentation of existing irrigation systems and coordinating with proposed systems, review shop <br />drawing submittals and perform on-site inspections to insure compliance with the construction documents for (18) Miami -Dade <br />County Public Schools. <br />(1)TITLE AND LOCATION (CV end State) <br />(2) YEAR COMPLETED <br />Various Parks for Miami -Dade County Parks and Recreation <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfepplicabfe) <br />Miami, Florida <br />2000-2002 <br />b' <br />(3) BRIEF DESCRIPTION (Bdefscope,a&&,,00atetc.) AND SPECIFIC ROLE HCheck if project performed with current firm <br />Project manager for various Miami -Dade County Park Improvement projects. Responsibilities included reviewing and revising bid <br />documents, establishing construction schedules, intitiating Requests for Proposals, providing bid award to contracor, managing <br />construction and approving pay requisitions for improvements at Continental Park, Royal Green park, Sandpiper Park and Highland <br />Oaks Park. <br />(1)TITLE AND LOCATION (City and State) <br />(2)YEAR COMPLETED <br />City of Doral Street Tree Planting <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if app licabb) <br />Doral, Florida <br />2005-2006 <br />—0-0 <br />2008-2009 <br />(3) BRIEF DESCRIPTION (Briefscope,sire,costetc.) ANDSPECIFICROLE <br />c' <br />Responsibilities include coordination with Contractor, reviewing proposed tree locations with Contractor andreviewing pay <br />requisitions for thr implementation of the Street Tree Master Plan in Doral. <br />(1)TITLE AND LOCATION (City and State) <br />(2)YEAR COMPLETED <br />Various GMP projects with Miami -Dade County Public School <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicabb) <br />Miami -Dade County, Florida <br />2000-2001 <br />d' <br />(3) BRIEF DESCRIPTION (Bnefsoope,ske,cost, etc.) AND SPECIFIC ROLE Check if project performed with curren t firm <br />Project Manager for various GMP construction management at risk projects such as South Miami Sr. High, South Miami Middle <br />School, Naranja Elementary School and Gloria Floyd Elementary School. Responsibilities included reviewing pre -construction <br />plans, construction cost estimating ($1 million to $15 million), bidding, procuring sub -contractors, processing pay requisitions and <br />closing out projects, <br />(1)TITLE AND LOCATION (Cifyand State) <br />(2)YEAR COMPLETED <br />Biscayne Boulevard Roadway Improvements <br />North Miami, Florida <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ffapplfrable) <br />1997 <br />(3) BRIEF DESCRIPTION (Brtafscope,eke, cost, etc.) AND SPECIFIC ROLE Check if project performed with 'current firm <br />e, <br />Project Manager for a $9 million dollar project consisting of widening Biscayne Boulevard, bridge construction and utility <br />relocation. Responsibilities included soliciting bids, transmitting RFI's, shop drawing review and submittals, conducting weekly <br />construction meetings and preparing pay requisitions. <br />STANDARD FORM 330 (612004) PAGE 2 <br />O'LEARY RICHARDS DESIGN ASSOCIATES, INC. 33 <br />