Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />h inn p Alvaro? P G Principal /Chief Engineer 36 20 <br />(City and State) <br />Alvarez Engineers, Inc. <br />Doral, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17, CURRENT PROFESSIONAL REGISTRATION (STATEAND DISCIPLINE) <br />B.S.in Civil Engineering and B.S in Architectural Engineering I Florida Professional Engineer #38522 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, e <br />National Society of Professional Engineers; Florida Engineering Society <br />19. RFI FVANT PRO.JFCTS <br />O'LEARY RICHARDS DESIGN ASSOCIATES, INC. <br />STANDAHD FORM 330 (612004) PAGE Z <br />34'i <br />(1) TITLE AND LOCATION (City and State) <br />NE 16th Ave. Corridor, from NE 123rd St. to NE Miami -Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (1fapprrcable) <br />135th St. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE P< I Check if project performed with current firm <br />a <br />Scope: Reconstruction of a 2 -lane 0.76 mile roadway, which includes striped center turn lane, sidewalks, curb & gutter, <br />bike lanes, continuous storm drainage system, pavement markings and signage, signal modifications, landscaping. <br />Construction cost: $3,615,077 (estimated) <br />Role: Chief Engineer / Professional Services: 2014 - Present <br />(1) TITLE AND LOCATION (City and Statel <br />SR -5 I US -1 / S. Dixie Hwy., from C -1 00A Canal Miami -Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (Ifapprrcable) <br />to SW 100th St. <br />2015 <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE LJ Check if project performed with current firm <br />e' <br />Scope: Intersection safety project to improve the horizontal alignment of US -1 and create an auxiliary lane on the NB <br />direction. Design of roadway, SPM, signalization and lighting / Construction cost: $1,800,000 (estimated) <br />Role: Chief Engineer / Professional Services: 2013 - 2015 <br />(1) TITLE AND LOCATION (City and Statel <br />SR -5 / US -1 / S. Dixie Hwy. at SR -9 / SW 27th Miami -Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ave. <br />2014 2015 <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.1 AND SPECIFIC ROLE EJ Check if project performed with current firm <br />c' <br />Scope: Intersection improvements on a 6 -lane divided urban road including roadway resurfacing, pavement widening, <br />cross slope correction, roadside safety improvement, signing and pavement marking, signalization upgrades per safety. <br />Construction Cost: $1,061,110 <br />Role: Chief Engineer/ Professional Services: 2012 - 2014 <br />(1) TITLE AND LOCATION (City and State) <br />SR -5 / US -1 /S. Dixie at SW 211 th St. / SW Miami -Dade County, FL <br />(2) YEAR COMPLETED _ <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />117th Ave <br />2014 2014 <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc,) AND SPECIFIC ROLE Check if project performed with current firm <br />d' <br />Scope: Intersection Safety improvements project, design of roadway, signing and pavement marling, signalization and <br />lighting / Construction Cost: $264,539 <br />Role: Chief Engineer/ Professional Services: 2012 - 2014 <br />(1) TITLE AND LOCATION (City and State) <br />Waterstone Way Widening at SW 312 Street City of Homestead, <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapprrcable) <br />and Guardhouse improvements Miami -Dade County, FL <br />2008 <br />2008 <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE K I Check if project performed with current firm <br />e' <br />Scope: Construction of a 0.23 mile 4 -lane divided roadway; design included roadway, signing and pavement marking <br />and lighting. Guardhouses and Other Miscellaneous Public Improvements / Construction Cost: $ 1,020,000 <br />Role: Chief Engineer / Professional Services: 2008 <br />O'LEARY RICHARDS DESIGN ASSOCIATES, INC. <br />STANDAHD FORM 330 (612004) PAGE Z <br />34'i <br />