My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum No. 2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-10-02 Design, Permitting, Fabrication and Inst. of Barrier at Heritage
>
Addendum No. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2011 11:59:58 AM
Creation date
11/15/2011 11:59:47 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design Aluminum Security Barrier
Bid No. (xx-xx-xx)
11-10-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. other property at the site or adjacent thereto, including trees, shrubs, lawns, <br />walks, pavements, roadways, structures and utilities not designated for removal, <br />relocation or replacement in the course of construction. <br /> <br />3.2.16 OSHA Safety - OSHA 1926 Construction Standard. <br /> <br />3.2.16.1 <br /> <br />3.2.16.2 <br /> <br />3.2.16.3 <br /> <br />3.2.16.4 <br /> <br />3.2.16.5 <br /> <br />3.2.16.6 <br /> <br />3.2.16.7 <br /> <br />The Contractor shall give all notices and comply with all applicable laws, <br />ordinances, permits, rules, regulations and lawful orders of any public <br />authority bearing on the safety or persons or property or their protection <br />from damage, injury or loss. Contractors shall comply with the <br />requirements of the Trench Safety Act, Chapter 553, Florida Statutes. <br />Each specific subcontract within the scope of such act shall be in <br />compliance with the Act and Contractor hereby acknowledges the Bid <br />complies with and was prepared in accordance with the Act. The Trench <br />Safety Compliance Act Form is located in Section B of this bid package. <br /> <br />The Contractor shall at all times safely guard the City's property from <br />injury or losses in connection with the Contract. Contractor shall at all <br />times safely guard and protect work and adjacent property from damage <br />as provided by law and the Contract Documents. All passageways, <br />guard fences, lights and other facilities required for protection by <br />applicable safety regulations must be provided and maintained by the <br />Contractor. <br /> <br />The Contractor shall erect and maintain, as required by existing <br />conditions and progress of the Work, all reasonable safeguards for <br />safety and protection, including posting danger signs and other warnings <br />against hazards, promulgating safety regulations and notifying Citys and <br />users of adjacent utilities. <br /> <br />When the use or storage of explosives or other hazardous materials or <br />equipment is necessary for the execution of the Work, the Contractor <br />shall exercise the utmost care and shall carry on such activities under <br />the supervision of properly qualified personnel. <br /> <br />Asbestos Assessment applies to renovation/construction of existing <br />bu ild ings/structures. <br /> <br />Material Safety Data Sheets <br />a. Any Contractor bringing chemicals on-site must provide the City <br />the appropriate hazard information on these substances, <br />including the labels used and the precautionary measures being <br />taken in working with these chemicals. <br /> <br />The Contractor shall promptly remedy, at the Contractor's own cost and <br />expense, all damage or loss to any property caused in whole or in part <br />by the Contractor, any Subcontractor, any Sub subcontractor, or anyone <br />directly or indirectly employed by any of them, or by anyone for whose <br />acts any of them may be liable and for which the Contractor is <br />responsible. The foregoing obligations of the Contractor are in addition to <br />obligations under the agreement. In case of failure on the part of the <br />Contractor to make good such damage, the City may, upon two (2) <br />calendar days written notice, proceed to repair, rebuild or otherwise <br />restore such property as may be necessary, and the cost thereof will be <br />deducted from any monies due or to become due the Contractor. <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.