My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum No. 2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-10-02 Design, Permitting, Fabrication and Inst. of Barrier at Heritage
>
Addendum No. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2011 11:59:58 AM
Creation date
11/15/2011 11:59:47 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design Aluminum Security Barrier
Bid No. (xx-xx-xx)
11-10-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3.2.16.14 <br /> <br />3.2.17. EMERGENCIES <br /> <br />3.2.17.1 <br /> <br />3.2.17.2 <br /> <br />3.3 Use of Site <br /> <br />The Contractor shc.;j'flot load or permit any part of the Work to be loaded <br />so as to endanger its safety.' <br /> <br />In any emergency 'affecting 'the safety of persons or property, the <br />Contractor shall act to prevent threatened damage, injury or loss. The <br />Contractor shall notify the City of the situation and all actions taken <br />immediately thereefter. If, in the opinion of the Contractor, immediate <br />action is not required, the Contractor shall notify the City of the <br />emergency situation "'and proceed in accordance with the City's <br />instructions. Any additional compensation or extension of time claimed <br />by the Contractor 011 account of emergency work shall be determined as <br />provided in the Agreement. <br /> <br />Material Safety Data Sheets <br />Any Contractor bringing chemicals on-site must provide the City the <br />appropriate hazard information on these substances, including the labels <br />used and the precautionary measures being taken in working with these <br />chemicals. <br />The Contractor shall promptly remedy, at the Contractor's own cost and <br />expense, all damage or loss to any property caused in whole or in part <br />by the Contractor, &llySubcontractor, any Sub subcontractor, or anyone <br />directly or indirectly employed by any of them, or by anyone for whose <br />acts any of them may be liable and for which the Contractor is <br />responsible. In case of failure on the part of the Contractor to make good <br />such damage, the City may, upon two (2) calendar days written notice, <br />proceed to repair, rebuild or otherwise restore such property as may be <br />necessary, and the cost thereof will be deducted from any monies due or <br />to become due the Contractor. <br />The Contractor is solely responsible for any fees, fines, or expenses <br />incurred and any delays caused by OSHA fees, fines, expenses or shut <br />downs do not constitute a right to claim for a time extension. <br /> <br />3.3.1 The Contractor shall limit operation~ and storage of material to the area within the Work <br />limit lines shown on Drawings, except as necessary to connect to exiting utilities, shall not <br />encroach on neighboring property,' and shall exercise caution to prevent damage to <br />existing structures. <br /> <br />3.3.2 Only materials and equipment, which are to be used directly in the Work, shall be brought <br />to and stored on the Work site by t:,e Contractor. After equipment is no longer required <br />for the Work, it shall be promptly removed from the Work site. Protection of construction <br />materials and equipment stored ai the Work site from weather, theft, damage and all <br />other adversity is solely the responsibility of the Contractor. <br /> <br />3.3.3 No project signs shall be erected without the written approval of the City's <br />Representative. <br /> <br />3.3.4 The Contractor shall ensure that rle Work is at all times performed in a manner that <br />affords reasonable access, both vehicular and pedestrian, to the site of the Work and all <br />adjacent areas. The Work shall be performed, to the fullest extent reasonably possible, <br />in such a manner that public areas adjacent to the site of the Work shall be free from all <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.