<br />day. Delays attributaole' to and within the control of a Subcontractor or supplier shall not <br />justify an extension oi the Contract Time. <br /> <br />6.2.4 Notwithstanding anything to the contrary in the Contract Documents, an extension in the <br />Contract Time, to thl?- extent permitted under this provision, shall be the sole remedy of <br />the Contractor for any (1) delay in the commencement, prosecution or completion of the <br />Work, (2) hindrano"or obstruction in the performance of the Work, (3) loss of <br />productivity, or (4) other similar claims due to or caused by any events beyond the control <br />of both the City and Contractor. In no event shall the Contractor be entitled to any <br />compensation or recovery of any damages or any portion of damages resulting from <br />delays caused by or within the control of Contractor or by acts or omissions of Contractor <br />or its Subcontractors of any tier or delays beyond the control of both City and Contractor. <br />If the Contractor contends that delay, hindrance, obstruction or other adverse condition <br />results from acts or omissions of the City, the City's Representative or the NE, <br />Contractor shall promptly provide written notice to the City. Contractor shall only be <br />entitled to an adjustment in the Contract Sum to the extent that such acts or omissions <br />continue after the Contractor's written notice to the City of such acts or omissions. The <br />City's exercise of any of its rights or remedies under the Contract Documents (including, <br />without limitation, ordering changes in the Work, or directing suspension, rescheduling or <br />correction of the Work) regardless of the extent or frequency of the City's exercise of <br />such rights or remedies, shall not be the basis of any Claim for an increase in the <br />Contract Sum or Contract Time. In the event Contractor is entitled to an adjustment in <br />the Contract Sum for any delay, hindrance, obstruction or other adverse condition caused <br />by the acts or omissions of the City, the City's Representative or the NE, Contractor shall <br />only be entitled to its actual direct costs caused thereby and Contractor shall not be <br />entitled to and waives any right to special, indirect, or consequential damages including <br />loss of profits, loss of savings or revenues, loss of anticipated profits, labor inefficiencies, <br />idle equipment, home office overhead, and similar type of damages. <br /> <br />6.2.5 If the Contractor submits a progress report or any construction schedule indicating, or <br />otherwise expressing an intention to achieve completion of the Work prior to any <br />completion date required by the Contract Documents or expiration of the Contract Time, <br />no liability of the City to the Contractor for any failure of the Contractor to so complete the <br />Work shall be created or implied. Further, the Contractor acknowledges and agrees that <br />even if Contractor intends or is able to complete the Work prior to the Contract Time, it <br />shall assert no Claim and the City shall not be liable to Contractor for any failure of the <br />Contractor, regardless of the cause of the failure, to complete the Work prior to the <br />Contract Time. <br /> <br />PROVISION 7 <br />F J\ YMENTS AND COMPLETION <br /> <br />7.1 Commencement, Prosecution, and Completion <br /> <br />7.1.1 The Contractor shall .:ommence Work within five (5) days upon the date of a "Notice to <br />Proceed" from the City or the date fixed in the Notice to Proceed. Contractor shall <br />prosecute the Work v/ith faithfulness and diligence, and the Contractor shall complete the <br />Work within the Contr act Time set forth in the Contract Documents. <br /> <br />7.1.2 In the event Contractor fails to provide City such documents, Contractor may not enter <br />upon the site of the Work until such documents are provided. The date the Contractor is <br />required to commence and complete the Work shall not be affected by the City denying <br />Contractor access to ~he site as a result of Contractor's failure to provide such documents <br />and Contractor shall not be entitled to an adjustment of the Contract Time or Contract <br />sum as a result of its failure to comply with the provisions of this Paragraph <br /> <br />24 <br />